Laserfiche WebLink
APPENDIX <br /> KLEMF=FR FIELD ACTSiftMPROTOCOL <br /> c SMpling and AtWysis Plan (YJeinfdder, Noveniberl, I Ptt <br /> lac. <br /> in . Plan <br /> s • is <br /> 1989 <br /> PoP <br /> Addendum #t and4d of <br /> and <br /> pvcedures dt=med in this appoxiix,Kleinfelder Field Activitiest , <br /> l, cx t� the <br /> nwre • Plam <br /> GROUNDWATER MONITORING- <br /> Monitoring <br /> OO G-M `tor ng Wells <br /> Equit <br /> 9mumhvater Monitozing wells at Forward are eqU4*Ped With&4 ted submerged Pis far <br /> purging and c011ect1ka,Smundwater sample& 71m field d <br /> MOSitming t have a list of equipuzeat uld be av&&b1c etb the � <br /> lo*6toring-' The nft=ary equipment is asted below. ius list injuds c,,wvp�used <br /> to purge and sarnpit the vrells in adffition to pcnxma pr6tecavc gear that must bac vx= for <br /> PrOtcuion d to reduce the poftatW for a=com=inadon of the wells and SaUVI'Mf <br /> the t used s d '6 whichrequire Calibration- <br /> Procedures .. <br /> discussed ,. <br /> Calibration MaA - - <br /> Y Ofthe=ctcrs that am used in ttae&M be cahlrated 6 produce reliable- <br /> "Owing&V-M 'bration rad4onale pocedures,and ficilmency for <br /> WAW l i ;el indicators ' y to asmc dmt data IS not being tzt <br /> easured <br /> Y due to the cabit stretching. 'T' calibrate <br /> the #e Is run 01A <br /> to its me against a tape measure. The 0 point is the,Txazatt on t probe bc <br /> whichetCS the • 't wh4m contactedby the MP14W dTtuit M= the <br /> 23 4 3 9- 1 W j0R32:S A.1 My t , <br /> c� �,ate, <br />