My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sieve Size Percent Passing by <br /> 1" 100 <br /> 1/2" 0-15 <br /> No. 4 0-5 <br /> No. 200 0-2 <br /> B. The minimum hydraulic conductivity to water shall be 1.0 cm/sec. <br /> C. Coarse Gravel Material placed directly on geotextile and around HDPE pipe shall <br /> contain no angular particles. <br /> D. Coarse Gravel Material shall contain no limestone or other material that will <br /> adversely react with leachate. <br /> E. The Coarse Gravel shall be provided by the EARTHWORK CONTRACTOR <br /> 2.8 PROTECTIVE OPERATIONS LAYER <br /> A. The material shall consist of generally sandy material excavated onsite. The <br /> material shall be obtained from, the onsite borrow area. Protective operations <br /> layer placed directly above geosynthetics shall have no angular particles greater <br /> than 1 inch. <br /> 2.9 PLYWOOD SHEETING <br /> A. Plywood sheeting shall be exterior grade and provided at the dimensions shown <br /> on the Construction Drawings. <br /> 2.10 EQUIPMENT <br /> A. General`. <br /> 1. Equipment used in constructing the Work shall be in good working order and <br /> shall be operated in strict accordance with manufacturer's instructions and <br /> recommendations. <br /> 2.� Any soils contaminated by discharge of fluids from leaky or faulty equipment <br /> shall be removed and properly disposed and the contaminated area backfilled <br /> with clean soil, at no cost to the OWNER. <br /> B. Clay Processing Equipment <br /> 1. Use clay processing equipment meeting the following requirements: <br /> a. Of a type and of sufficient size to process the onsite clay material to <br /> meet requirements for maximum clod size and to provide a <br /> homogeneously moisture conditioned material. <br /> b. Consisting of rotovator, discs, tilling, or other methods as necessary and <br /> Forward Landfill WMU FU-13 <br /> 02300 7 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.