Laserfiche WebLink
with these Specifications and the CQA Manual. <br /> G. Protection: <br /> 1. Do not route or allow construction traffic, except as necessary, on top of <br /> clay liner once material has been placed and compacted. <br /> 2. Constructed clay liner shall be maintained to meet the requirements of this <br /> Specification until final completion and acceptance of the Work. This shall <br /> include all measures to prevent erosion. During seasonal or other extended <br /> shutdowns, all exposed surfaces shall be protected as detailed in Article 3.1, <br /> PROTECTION OF EXPOSED SURFACES, of this Section. In addition, <br /> the clay liner shall be protected from any contamination that increases the <br /> hydraulic conductivity. Any contaminated material shall be removed and <br /> replaced at no cost to the OWNER. <br /> 3.10 CONSTRUCTION OF CLAY PLUG <br /> A. General: <br /> 3. Clay Plug Material shall be processed to meet the requirements of Article <br /> 2.5 of this Specification. The EARTHWORK CONTRACTOR shall have <br /> the option to determine construction procedures to be used, subject to the <br /> approval and acceptance testing by the QA/QC CONSULTANT. <br /> 4. The EARTHWORK CONTRACTOR shall process the Clay Plug Material <br /> suitable for the purpose intended. After processing, the Clay Plug Material <br /> shall be free from dry clods, roots, organic matter, frozen material, debris, <br /> rocks or stones`larger than 1 inch, and other deleterious material. Clay <br /> Material ;shall be thoroughly blended and compacted to provide a <br /> homogeneous material relatively uniform in gradation and moisture content. <br /> 5. The Clay Plug Material shall be as uniform as possible, free of penetrating <br /> cracks, and having interlift boundaries completely blended. The soil shall <br /> be compacted to produce a soil structure having low hydraulic conductivity. <br /> B. Compaction: <br /> 1. Soil shall be spread evenly over the prepared subgrade with a thickness as <br /> required to achieve a 6-inch compacted lift, with a maximum 8-inch loose <br /> lift. <br /> 2. The minimum final thickness and extent of the clay plug shall be as shown <br /> on the Construction Drawings. <br /> 3. Moisture conditioning shall be uniform throughout each lift <br /> 4. The clay plug material shall be compacted in-place to a minimum dry <br /> density of 90 percent relative compaction at a water content of 3 to <br /> ® 6 percent greater than the optimum water content as measured by ASTM <br /> D1557. <br /> 5. Scarify surface of each lift to a depth of 2 inches prior to placing the <br /> subsequent lift of Clay Plug Material. <br /> Forward Landfill WMU FU-13 <br /> 02300 17 EARTHWORK <br />