My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The EARTHWORK CONTRACTOR shall construct at least one temporary pipe <br /> crossing point within the WNW to provide access for necessary construction <br /> traffic. These temporary crossing points shall be located by the EARTHWORK <br /> CONTRACTOR and shall consist at a minimum of the completed Coarse Gravel <br /> and Granular Drainage Material Components, and a minimum of 2.5 feet of <br /> Protective Operations Layer extending a minimum of 4 feet from the centerline of <br /> the pipe in each direction. <br /> 3.10 HDPE TANKS <br /> A. Care shall be taken during the placement of each tank in order to not damage the <br /> underling geomembrane within each sump. Damage to the geomembrane <br /> incurred during placement o the tanks shall be repaired at the EARTHWORK <br /> CONTRACTOR's sole expense. <br /> B. General earthfill shall be compacted around the HDPE tanks in accordance with <br /> Section 02300, EARTHWORK, and as shown on the Construction Drawings. <br /> Hand held equipment may be necessary to obtain adequate compaction of the <br /> general earthfill around the tank. <br /> PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT <br /> AND PAYMENT PROCEDURES) <br /> END OF SECTION <br /> Forward Landfill WMU FU-13 <br /> 02535 5 LEACHATE PIPES <br />
The URL can be used to link to this page
Your browser does not support the video tag.