Laserfiche WebLink
SECTION 02774 <br /> GEOCOMPOSITE DRAINAGE NET (GEOCOMPOSITE) <br /> PART 1 GENERAL <br /> 1.1 WORK INCLUDED <br /> A. This section covers the Work necessary to furnish and install Geocomposite Drainage <br /> Net(Geocomposite) on the side slopes of WMU FU-13, complete. <br /> B. The GEOSYNTHETICS CONTRACTOR shall furnish all labor,supervision,tools, <br /> equipment, and materials necessary to complete the Geocomposite installation <br /> including,but not limited to,submittals,panel layout,seaming,temporary anchorage, <br /> and all necessary and incidental items required to complete the Work in accordance <br /> with these Specifications and the Construction Drawings. The EARTHWORK <br /> CONTRACTOR will perform excavation and backfilling of anchor trenches and will <br /> unload the Geocomposite if the GEOSYNTHETICS CONTRACTOR is not onsite. <br /> 1.2 REFERENCES <br /> A. American Society for Testing and Materials (ASTM): <br /> 1. D792, Test Method for Density and Specific Gravity (Relative Density) of <br /> Plastics by Displacement <br /> 2. D1603, Standard Test Method for Carbon Black in Olefin Plastics. <br /> 3. D4716, Test Method for Constant Head Hydraulic Transmissivity of <br /> Geotextiles and Geotextile Related Products <br /> 4. D5035,Test Method for Breaking Strength and Elongation of Textile Fabrics <br /> (Strip Method) <br /> 5. D5199, Test Method for Measuring Nominal Thickness of Geotextiles and <br /> Geomembranes. <br /> 1.3 DEFINITIONS <br /> A. Batch: A quantity of resin,usually the capacity of one railcar,used in the fabrication <br /> of high density polyethylene(HDPE)geonet. The finished product will be identified <br /> by a roll number corresponding to the particular quantity of resin used. <br /> B. QA/QC CONSULTANT: The party,independent from Manufacturer or Contractor, <br /> that is responsible for observing and documenting activities related to the quality <br /> assurance of production and installation of the geosynthetic components of the lining <br /> system. <br /> C. Construction Quality Assurance(CQA)Laboratory: The party,independent from the <br /> OWNER,Manufacturer,Fabricator,and Contractor,responsible for conducting tests <br /> on samples of geosynthetics obtained at the site. <br /> D. Fabricator: The party responsible for the fabrication of Geocomposite panels <br /> constructed from rolls received from the Geonet Manufacturer. <br /> ® FORWARD LANDFILL WMU FU-13 GEOCOMPOSITE <br /> 02774 1 DRAINAGE NET <br />