My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® measurements at intervals over the entire test duration. <br /> PART 3 EXECUTION <br /> 3.1 PLACEMENT OF GEOCOMPOSITE <br /> A. Place and anchor the Geocomposite in the manner and at the locations shown on <br /> the Construction Drawings and as directed by the QA/QC CONSULTANT. Place <br /> Geocomposite with the long dimensions downslope,unless otherwise directed by <br /> the DESIGN ENGINEER. Install Geocomposite smooth and free of tensions, <br /> stress, folds, wrinkles, or creases. <br /> B. Secure, leak-proof bags of sand shall be used to secure the Geocomposite during <br /> installation. Securing pins shall not be used. Sandbags that are placed on the <br /> Geocomposite at the base of the slope shall be removed by the EARTHWORK <br /> CONTRACTOR immediately prior to placement of the overlying granular <br /> drainage material. The sand bags shall be removed from the cell or placed above <br /> the protective operations layer and shall not be left within the granular drainage <br /> material layer. <br /> C. Care shall be taken to keep the Geocomposite clean and free from debris prior to <br /> installation. If Geocomposite is not free of soil and debris before installation, it <br /> shall be cleaned by the GEOSYNTHETICS CONTRACTOR just prior to <br /> installation. <br /> 1pD. Lay Geocomposite to ensure that runouts at terminations and tie-ins are placed to <br /> the minimum dimensions shown on Construction Drawings. Place Geocomposite <br /> in anchor trench at top of slope to the minimum dimensions shown on <br /> Construction Drawings. <br /> 3.2 JOINTS <br /> A. Horizontal Joints: No horizontal joints will be permitted without prior approval <br /> of the DESIGN ENGINEER. <br /> B. Vertical Joints: Geocomposite panels shall be laid smooth to provide a minimum <br /> width of 4 inches of geonet overlap for each vertical joint. Geonet vertical joints <br /> shall be tied at 5-foot intervals using a method approved by the QA/QC <br /> CONSULTANT. Plastic ties or tying materials shall be of contrasting color to the <br /> Geocomposite panels for inspection. Metallic connectors shall not be allowed. <br /> C. Sewn Seams: The geotextile component of the Geocomposite shall be joined by <br /> sewing continuously. <br /> 1. Seam Efficiency: <br /> a. Minimum 70 percent. <br /> b. Tested according to ASTM D4884. <br /> ® FORWARD LANDFILL WMU FU-13 GEOCOMPOSITE <br /> 02774 7 DRAINAGE NET <br />
The URL can be used to link to this page
Your browser does not support the video tag.