My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 Generalaq uire ents <br /> 2.1 Meetings <br /> In order to facilitate construction, and to clearly define construction goals and activities, close <br /> coordination between the Owner,Design Engineers,QA/QC Consultant,and Contractor is essential. <br /> To meet this objective,pre-construction and progress meetings will be held. <br /> 2.1.1 Pre-Construction Meeting <br /> Following bid award, a pre-construction meeting will be held at the site. The purpose of this <br /> meeting, attended by the Owner, Contractor, Design Engineer, QA/QC Consultant, and others <br /> designated by the Owner,will be to: <br /> Review the construction drawings, specifications, CQA Manual,work area security,health <br /> and safety procedures, and related issues. <br /> Provide all parties with relevant project documents. <br /> Review responsibilities and qualifications of each party. <br /> Define lines of communication and authority. <br /> Establish reporting and documenting procedures. <br /> Review procedures for handling submittals. <br /> Review testing equipment and procedures. <br /> Review procedures for field directives and change orders. <br /> Establish testing protocols and procedures for correcting and documenting construction or <br /> non-conformance. <br /> • Establish weekly meeting schedule. <br /> • Conduct a site inspection to discuss work areas, stockpile areas, lay down areas, access <br /> roads, haul roads, and related items. <br /> • Review the project schedule and critical path items. <br /> • Contractor's work plan. 0 <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.