My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Coordinate with the Earthwork Contractor and Owner to perform excavation verification <br /> surveys upon completion of excavating operations. Verify corrective action measures as <br /> determined by verification surveys. Verification surveys will also be used to determined <br /> limits of excavation for measurements and payment applications. Submit copy of <br /> verification surveys to the Construction Manager. <br /> 3.4.3 General Earthfill and Subgrade Fill <br /> • Verify that construction staking is performed before work and that survey bench marks <br /> with elevations are secured outside the work area. <br /> • Perform visual and manual soil classifications (ASTM D2488) to verify that material <br /> source is suitable for earthfills. Verify that the material is free of organic and oversized <br /> materials. Perform classifications continually during excavation of borrow materials. <br /> • Perform moisture-density relationship testing(ASTM D1557)to determine the maximum <br /> dry density and optimum moisture content of earthfill materials. Perform tests at testing <br /> frequencies specified in Section 3.2.2. <br /> • Verify that earthfill materials are placed and compacted in accordance with the <br /> Specifications. If a sheepsfoot compactor is not used, verify that the top of each <br /> compacted lift is scarified before placing the subsequent lift. <br /> • Verify that general earthfill placed around HDPE tanks is appropriately compacted.Hand <br /> held compaction equipment may be necessary to obtain adequate compaction around <br /> HDPE tanks. <br /> • Perform nuclear density-moisture tests(ASTM D2922 and ASTM D3017)to verify that <br /> each lift is compacted as required by the technical specifications. Perform tests at testing <br /> frequencies specified in Section 3.2.2. <br /> • Verify that soil materials that are too wet for proper compaction per Specifications are <br /> properly aerated and processed to bring the moisture content of the material into the <br /> acceptable range of the optimum moisture content. <br /> • Verify that earthfill soils that are too dry for proper compaction per Specifications are <br /> properly moisture conditioned and processed to bring the moisture content into the <br /> acceptable range of the optimum moisture content. <br /> • Verify that desiccated earthfills are properly repaired or removed before placing <br /> subsequent lifts. <br /> Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.