My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Record of any site visitors. <br /> • Signature of QA/QC Manager or QA/QC Inspector. <br /> • Signature of the peer reviewer. <br /> 6.1.2 Observation and Test Data Sheets <br /> Observation and test data sheets should include the following information as is appropriate for the <br /> form being used. <br /> • Date, Project name, and location. <br /> • A unique number for cross-referencing and document control. <br /> • Weather data, as applicable. <br /> • A reduced scale site plan showing sample and test locations. <br /> • Test equipment calibrations, if applicable. <br /> • A summary of test results identified as passing, failing, or, in the event of a failed test, <br /> retest. <br /> • Completed calculations. <br /> • Signature of the QA/QC Manager or QA/QC Inspector. <br /> • Signature of the peer reviewer. <br /> 6.1.3 Non-Conformance Reports <br /> In the event of a non-conformance event, a non-conformance verification report form will be <br /> included with the daily report.Procedures for implementing and resolving any non-conformities to <br /> the contract are outlined in Section 2.4 of this CQA manual. <br /> 6.2 Weekly Progress Reports <br /> The QA/QC Manager will prepare weekly progress reports summarizing construction and quality <br /> assurance activities. The reports will contain, at a minimum,the following information: <br /> • The date,project name, and location. <br /> Page 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.