My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A list of changes from the Construction Drawings and Specifications and the <br /> justifications for these changes. <br /> • As-built record drawings. <br /> • A statement that the interface shear strength meet or exceed the specified requirements. <br /> If the interface shear strength results do not meet or exceed the specified requirements, <br /> contact the Design Engineer and append a revised stability analysis, prepared by the <br /> Design Engineer. <br /> • A statement of compliance with the construction contract documents and design intent <br /> signed and stamped by the QA/QC Manager, a professional engineer registered in the <br /> state of California. <br /> The as-built record drawings will accurately locate the constructed location of all work items, <br /> including the edge of geomembrane,location of piping,anchor trenches,etc.All surveying and base <br /> maps required for the development of the record drawings will be prepared by the Contractor and the <br /> Owner. The QA/QC Manager must review and verify that as-built drawings are correct. As-built <br /> record drawings will be included in the final CQA report. <br /> Page 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.