Laserfiche WebLink
Contents <br /> Section Page <br /> 1 Introduction..........................................................................................................................1-1 <br /> 2 Base and Final Grading.......................................................................................................2-1 <br /> 2.1 General .............................................................................................................................2-1 <br /> 2.2 Liner and LCRS Grades...................................................................................................2-1 <br /> 2.3 Supported Lining Systems................................................................................................2-2 <br /> 2.3.1 Analytical Method..........................................................................................2-2 <br /> 2.3.2 Supported Lining System for Slopes Steeper than 6:1 ...................................2-3 <br /> 2.3.3 Supported Lining System for Slopes Flatter than 6:1.....................................2-3 <br /> 2.4 Refuse Fill Grades............................................................................................................2-4 <br /> 3 Slope Stability.......................................................................................................................3-1 <br /> 3.1 Analytical Method............................................................................................................3-1 <br /> 3.2 Stability Analysis..............................................................................................................3-2 <br /> 3.2.1 Material Properties .........................................................................................3-2 <br /> 3.2.2 Results of Slope Stability Analyses................................................................3-3 <br /> Ailk <br /> Surface Drainage.................................................................................................................. -1 <br /> 5 Containment System.............................................................................................................5-1 <br /> 5.1 Lining System............................................................................................................5-2 <br /> 5.1.1 Clay Liner.......................................................................................................5-2 <br /> 5.1.2 Geosynthetic Clay Liner.................................................................................5-3 <br /> 5.1.3 HDPE Geomembrane............................................................ ...5-3 <br /> 5.2 Leachate Collection and Removal System(LCRS)...................................................5-3 <br /> 5.2.1 Slope LCRS....................................................................................................5-4 <br /> 5.2.2 Base LCRS.....................................................................................................5-4 <br /> 5.3 Protective Operations Layer......................................................................................5-5 <br /> 6 Summary...............................................................................................................................6-1 <br /> 7 References.............................................................................................................................7-1 <br /> Appendices <br /> Appendix A. Construction Drawings <br /> Appendix B. Design Calculations <br /> Appendix C. Specifications <br /> Appendix D. Construction Quality Assurance(CQA)Manual <br /> WMU FU-13 <br />