Laserfiche WebLink
:7 <br />• <br />0 <br />DEL -TECH GEOTECHNICAL SUPPORT SERVICES, INC. <br />(209) 847-8757 (OFFICE) • (209) 847-3700 (FAX) • deltech l@pacbell.net (Email) <br />SITE: FORWARD LANDFILL / MANTECA, CA. <br />GROUNDWATER TREATMENT SYSTEM MONITORING LOG 2014 <br />DOWNTIME LOC <br />TOWER PUMPING <br />OPERATION SYSTEM TIME I TIME <br />DATE STATUS NAME OFFLINEI ONLINE ACTIONS/ REASON FOR DOWNTIME <br />January 14, 2014 EX - 3R & EX - 4 OFF LINE ??? 7}IE EI1IRICAL BREAKERS WERE "TRIPPED / REASON UNKNOWN <br />January 21, 2014 ALL PUMPS RUNNING ALL PUMPS OPERAMN /ONLNE RUNNG <br />Februa 5, 2014 ALL PUMPS RUNNING ALL PUMPS OPERAMN /ONLINE RUNNG <br />February 26 2014 ALL PUMPS RUNNING ALL PUMPS OPERATION /ONLINE BONING <br />March 10, 2014 ALL PUMPS RUNNING ALL PUMPS OPERAMN /ONLINE RUNNG <br />March 29, 2014 ALL PUMPS RUNNING ALL PUMPS OPERATION /ONLINE RUNNG <br />April 8, 2014 EX - 4 FLOW METER STOPS METER KEEPS STICI NG <br />April 23, 2014 O - 1.1 ` EX - 3R OFF LINE 11:29 OVERLOAD RELAY TRIPPED POSSIBLE POWER SURGE /RESET <br />May 8, 2014 ON - LE ALL PUMPS RUNNING ALL PUMPS OPERAMNAL /ONLNE RurmaG <br />May 27, 2014 ON - LI ALL PUMPS RUNNING ALL PUMPS OPERATIONAL /ONLNE RUNING <br />June 18, 2014 ALL PUMPS RUNNING ALL PUMPS OPERATIONAL /ONLINE RUNNG <br />June 27, 2014 OFF - LINE PUMPS OFF FOR MAINT. _< TowFR cLEANING / TUTALIZER CALIBRATIONS <br />July 15, 2014 OFF - LINE EW -3R & EW -4 OFFLINE RANDOM POWER OUTAGES <br />July 29, 2014 ALL PUMPS RUNNING WELL IDTAL12ERS IN FOR FACTORY CALIBRATION <br />August6,2014 ALL PUMPS RUNNING <br />August 29, 2014 ALL PUMPS RUNNING <br />September 2, 201Q EW - 1, 2,3R, 4 NEW CALIBRATED TOTALIZER METERS INSTALLED <br />September 8, 2014 OFF-LINE- EW-311&EW-4 OFFLINE RANDOM POWER OUTAGES <br />September 24, 2014 ALL PUMPS RUNNING ALL PUMPS OPFRAnON /ONLINE RUNING <br />ON 6/22/14 - THE AIR STRIPPER TOWER WAS TAKEN OFF-LINE FOR ACID WASHING TASKS. THE TOWER HAS A SIGNIFICANT CALCIUM BUILDUP. <br />ALSO THE TOTALIZERS FOR THE FOUR EXTRACTION WELLS HAVE BEEN REMOVED AND SHIPPED TO THE MANUFACTURER FOR CALIBRATION. <br />THE TOWER TOTALIZER IS STILL INSTALLED TO TRACK THE AIR STRIPPER SYSTEMS THROUGHPUT. ONCE THE WELL TOTALIZERS ARE RETURNED THEY WILL BE <br />REPLACED. THEN THE AIR STRIPPER TOWERS TOTALIZER WILL BE SENT IN FOR CALIBRATION. <br />