Laserfiche WebLink
FORWARD LANDFILL <br />DAILY PRE -APPLICATION INSPECTION FO <br />Waste Discharge Requirements Order No. R,5-2014-0006 I <br />Weather conditions; <br />Temperature: uo"'F <br />Wind direction: bi Wind speed: - 5 <br />Other relevant field conditions: <br />Evidenceof erosion....................... ........................................................... c^:7 o .............................. ❑ Yes <br />Bermcondition ... ............................ ........................................................... t/Good ......................... :i Needs attention <br />Soilsaturation .............................................................................................. No .............................. :] Yes <br />Ponding. ...................... ................................................................................. No.............................. 0 Yes <br />Potential runoff to off-site areas ............................................................. L No.............................. E] Yes <br />Potential discharge to surface water ..................................................... To.............................. 11 Yes <br />Actual discharge to surface water ......................... I........................... I!r&o .............................. 0 Yes <br />Accumulation of organic solids .............................................................. To..................----........ El Yes <br />Soilclogging ....................... .......................... ............................................. r�-?Bi70 .............................. o Yes <br />Odors that have the potential to be objectionable at or <br />beyond the property boundary ............................................................... 5; -No .............................. L-., Yes <br />Vectors (insects, rodents) .......................................... ............................ 21540 .............................. D Yes <br />Documented observations requiring corrective action and corrective action taken (if applicable): <br />04- <br />Note: I\To valves are required as part of the land application operation. <br />Date/time: <br />-12A @ o 7/0 Signature: Tide: Operations Manager 'eLl "d,/' <br />Ruben Ramirez <br />