Laserfiche WebLink
FORWARD LANDFILL <br />DAILY PRE -APPLICATION INSPECTION F <br />Waste Discharge Requirements Order No. R5-2014-0006 <br />Weather conditions: <br />Temperature: <br />Wind direction* --Ki W Wind speed: --.. —7 11 <br />Other relevant field conditions: <br />Evidenceof erosion ........................................................... ....................... <br />'7. K-- �0 .............................. <br />::: Yes <br />Bermcondition .............................. <br />............................................................ <br />............ ............ <br />z Needs attention <br />Soilsaturation ..................... <br />............ ........................................... ............... <br />.............................. <br />El Yes <br />Ponding................................................................... <br />..................................... <br />bio.----.-.-----.-.-----...__.... <br />c Yes <br />Potential runoff to off-site areas ............................................................. <br />............................. <br />. -- Yes <br />Potential discharge to surface water ..................................................... <br />ZNO <br />... <br />Actual discharge to <br />� ............................. <br />ZIN <br />C1Yes <br />surface water ..........................................................� <br />o ............ ...... ........... <br />L: Yes <br />Accumulation of organic solids .............................................................. <br />, Z-54 0 .............................. <br />L7 Yes <br />Soilclogging <br />�No <br />.................................................................... ........................... <br />5r .............................. <br />C1 Yes <br />Odors that have the potential to be objectionable at or <br />beyond the property boundary.. <br />............................................................. 0 No .............................. 0 Yes <br />Vectors (insects, rodents) ....................................................................... L-1 <<01 ............................. E Yes <br />Mocumented observations requiring corrective action and corrective action taken (if applicabicil <br />Note.- No Palm an required as part of the land application operation. <br />Date/time: '1 /30C- <br />@ 'r, IV Signature: A4Z Tide: Operations Manager <br />Ruben Ramirez <br />