Laserfiche WebLink
FORWARD LANDFILL <br />DAILY PRE -APPLICATION INSPECTION FORM <br />Waste Discharge Requirements Order No. RS -2014-0006 <br />Weather conditions: <br />Temperature: <br />Wind direction: Wind speed: <br />Othez relevant field conditions: <br />I--,' <br />Evidence of erosion ......................................... ......................................... cl No .............................. 0 Yes <br />Bermcondition .............................. ............................................................ 01600d ......................... 0 Needs attention <br />Soilsaturation .............................................................................................. .............................. 0 Yes <br />Pondino•........................................................................................................ cx�o` ............................. o Yes <br />Potential runoff to off-site areas.................•--------................••---•--.......•••. e<N__' o ............................. o Yes <br />Potential discharge to surface water ..................................................... - c -o- ............................... 0 Yes <br />Actual discharge to surface water .......................................................... No .............................. El Yes <br />Accumulation of organic solids ...........................................................', Z�N'_o, .......................... c Yes <br />Soilclogging ................................................................................................ � Zo .............................. 0 yes <br />Odors that have the potential to be objectionable at or <br />beyond the property boundary .............................................................../No . ............................ Ei Yes <br />Vectors (insects, rodents) ....................................................................... 4 No .............................. 0 yes <br />Documented observations requiring, corrective action and corrective action taken (if applicablel <br />Dote: No valves are required axpa?,, of the land application operation. <br />Date/tirne: <br />3-1-2-0 _m @ -I! I Signature:Operations Manager <br />Ruben Ramirez <br />