STANDARD PROVISIONS AND REPORTING REQUIREMENTS, JANUARY 2012 _11 - <br />FOR <br />11 - <br />FOR WASTE DISCHARGE REQUIREMENTS <br />FOR DISCHARGES REGULATED BY SUBTITLE D AND/OR TITLE 27 <br />23. All construction of liner systems and final cover systems shall be performed in <br />accordance with a Construction Quality Assurance Plan certified by a registered <br />civil engineer or a certified engineering geologist [Title 27, § 20323]. <br />24. The Construction Quality Assurance program shall be supervised by a <br />registered civil engineer or a certified engineering geologist who shall be <br />designated the CQA officer [Title 27, § 20324(b)(2)]. <br />25. The Discharger shall ensure that a third party independent of both the <br />Discharger and the construction contractor performs all of the construction <br />quality assurance monitoring and testing during the construction of a liner <br />system. <br />26. The Discharger shall notify Central Valley Water Board staff at least 14 days <br />prior to commencing field construction activities including construction of a new <br />lined cell or module, construction of a final cover, or any other construction that <br />requires Central Valley Water Board staff approval under this Order. <br />27. The Discharger shall submit for review and approval at least 60 days prior to <br />proposed discharge, final documentation required in Title 27 Section <br />20324(d)(1)(C) following the completion of construction of a new lined landfill <br />module. The report shall be certified by a registered civil engineer or a certified <br />is engineering geologist and include a statement that the liner system was <br />constructed in accordance with the approved design plans and specifications, <br />the CQA Plan, the requirements of the WDRs, and that it meets the <br />performance goals of Title 27. The report shall contain sufficient information <br />and test results to verify that construction was in accordance with the design <br />plans and specifications, the construction quality assurance plan, and the <br />performance goals of Title 27. <br />28. The Discharger shall not discharge waste onto a newly constructed liner system <br />until the final documentation report has been reviewed and an acceptance letter <br />has been received. <br />29. Prior to placement of waste in a new landfill unit, the Discharger shall monitor <br />any pan lysimeter for the unit that has received enough rainfall to flood the <br />LCRS sump. If liquid is detected in the pan lysimeter, the Discharger shall verify <br />that the liquid is not from a leak in the primary liner system before waste can be <br />accepted to the new module. <br />1. The Discharger shall submit a final or partial final closure and post -closure <br />maintenance plan at least two years prior to the anticipated date of closure <br />[Title 27, § 21780(d)(1)]. <br />