My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:38:44 PM
Creation date
7/3/2020 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
il. rnactzve I•�inirlg O��erations <br />Inactive mining operations are defined in Attachment 1 of <br />this General Permit. 4where comprehensive site compliance <br />evaluations, non --storm water discharge visual observations, <br />storm water discharge visual observations, and storm water <br />sampling are impracticable, facility operators of inactive <br />mining operations may instead obtain certification once <br />every three years by a Registered Professional Engineer that <br />an SWPPP has been prepared for the facility and is being <br />implemented in accordance with the requirements of this <br />General Permit. By means of these certifications, the <br />Registered Professional Engineer having examined the <br />facility and being familiar with the provisions of this <br />General Permit shall attest that the SWPPP has been prepared <br />in accordance with good engineering practices. Facility <br />operators of mining operations who cannot obtain a <br />certification because of I,:oncompliance must notify the <br />appropriate Regional Water Bcard and, upon request, the <br />local agency which receives the storm, water discharge. <br />1.2. Sar�r�l3ng ar:d Ar�.�I j � F� «.fit i ons area Reductions <br />Am <br />facility operator to au 11fies for sampling and analysis <br />exemptions, as d--scre_l r;elow in Section B.I2.a.i., or wQ-Io <br />qualifies for reduced calm%ding and ana yS s, as described <br />below in Section B.12.b., mist. submit the appropriate <br />Certifications and req;.:irec.3 do(-umFnt: tion to the Regional <br />Water Boards prior to the wet seasc>n (October 1) and <br />recertify as part of the Annual Report. submittal. A <br />facility operator that qualifies for either the Regional <br />Water Board or .Local agency certification programs, as <br />described below in Section B.12.a.ii. and iii., shall summit <br />certification and documentatic)n in accordance with the <br />requirements of Lhose progiams. Facility operators who <br />provide certifications in accozdance with this Section ale <br />still required to comply with all other monitoring program <br />and reporting requirenents. Facility operators shall <br />prepare and submit their certifications using forms and <br />instructions provided by the State Mater Board, Regional <br />Water Board, or local agency or shall submit their <br />information on a form that contains equivalent information. <br />Facility operators whose facility no longer meets the <br />certification conditions crust notify the Regional Water <br />Boards (and local agency) within 30 days and immediately <br />comply with the Section B.S. sampling and analysis <br />requirements. Should a Regional. Water Board (or local <br />agency) determine that a certification does not meet the <br />conditions set forth below, facility operators must <br />immediately comply with the Section B.S. sampling and <br />analysis requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.