Laserfiche WebLink
share of the signal installation at the intersection of Austin Road/Madposa <br />Road. A previous study (Austin Road Landfill EIR, 1999) identifies a <br />mitigation measure that included the applicant's contribution to the <br />installation of a traffic signal at Austin Road/Mariposa Road. This is <br />included in existing permit requirements and is assumed to occur as part of <br />baseline conditions. <br />b. 4 (B.2) <br />Identified in EIR: <br />The project applicant shall contribute $3,768.84 toward the signal installation at Austin <br />Road/Arch Road. The applicant shall contribute $4,696.67 to the signal installation at the <br />intersection of Austin Road/French Camp Road. <br />5 (B.6) <br />Identified in EIR: <br />The applicant shall contribute a fair share to the required addition of a second eastbound -to - <br />southbound left turn lane to Austin Road that would be required to improve intersection <br />operations to acceptable levels. The improvement includes the addition of a second <br />eastbound -to -southbound left tum lane at the intersection of Mariposa Road/ Austin Road. <br />With the recommended improvement, the intersection would operate at LOS B with a V/C <br />ratio of 0.686 during the PM peak hour. <br />identified in EIR: <br />If future spills or accidents during waste transport indicate that changes should be made to <br />waste transport haul routes to the landfill from major arterials, SR 4 or Highway 99, the San <br />Joaquin County Public Works Department shall modify the haul routes as appropriate. <br />d. An encroachment permit shall be required for work within the road right-of-way. <br />(Development Title Sections 9-1 145 4 and 9-1145.51 <br />e. No excavation shall ba allowed within 25 feet of any road right-of-way. (Development Title <br />Section 9-1415.3fi1 <br />f. All grading shall remain a minimum of 25 feet from the banks of existing Little Johns Creek <br />until the realigned portion of the Creek is accepted by the State Reclamation Road food <br />Control Division). <br />g. A copy of the Final Site Plan shall be submitted. <br />h. The Traffic Impact Mitigation Fee wilt be reguiredJor this development. The fee is due and <br />payable at the time of building permit application. The fee currently is $164.32 per additional <br />daily trip -end generated in the Manteca area The fee shall be automatically adlusted July 1 <br />of each year by the Engineering Construction Cost Index as published by the Engineering <br />News Record A credit may be allowed if it can be verified that the existing development on <br />this site was In operation on or after April 23 1990 (Resolution R-00-4331 <br />I. A Maintenance Agreement, between the applicant and the County, to ensure that Austin <br />Road (including all bridges on the haul route) from Mariposa Road to French Camp Road, is <br />maintained to a condition acceptable to San Joaquin County shall be executed by the <br />applicant. The Maintenance A reement shall remain in force far the duration of operation <br />under this permit. <br />San Joaquin County UP -00-7, ER-00-21Forward, Inc. <br />is Page 6 <br />Community Development <br />