My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:38:44 PM
Creation date
7/3/2020 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discharged into Littlejohns Creek currently, which both recharges aquifers below and moves <br />offsite. <br />Treated groundwater from the groundwater extraction system is proposed to be infiltrated <br />back to the aquifer through an infiltration basin (AEE, 20018, 2002a) located near well <br />MW -11. The infiltration basin would improve recharge to the local aquifer and is also <br />designed to create a hydraulic barrier to inhibit further northward migration of the <br />groundwater plume. The RWQCB letter to Forward dated March 11, 2002 agreed to allow for <br />their recharge remedy (Alternative 11) to go forward without Aftemative 3 (extended <br />Pumping) while quarterly monitoring at the groundwater wells occurs. If the groundwater <br />VOC concentrations do not attenuate at a rate that is acceptable to the RWQCB then the <br />Board will require that Alternative 3, or some variant on Aftemative 3, be implemented. The <br />recent (AEE, 2002a) addendum to the corrective action proposed procedures to analyze the <br />hydrochernical trends and trigger concentrations at which additional extraction wells would be <br />considered. (Atkinson, 2002). <br />i. 51 (F.9) <br />Identified in EIR: <br />Replacement wells (as well as additional wells north of the Austin Road Landfill to better <br />define the leading edge of the plume) shall be installed to mitigate against the loss of old <br />wells as presented in the JTD currently under review by the RWQCB. The RWQCB must <br />approve the JTD's plans for the number and location of the new wells as part of their <br />approval process, which is separate from the EIR approval process. <br />J. 52 Austin 1994 (K3, c), Austin 2000 (K3. c) <br />The timing of the pumped discharge from the detention pond must not occur with the peak <br />flow rate of tittle John's Creek as this would impact downstream locations by increasing the <br />flood hazard Telemetry, which monitors the flow in the creek to determine the peak, should <br />be provided. This information should then be used to coordinate the start up of the pumps. <br />k. 56 (G.3) <br />Proposed as Part of the Project: <br />The project sponsor has prepared a seismicity study for the site. if the potential maximum <br />peak ground acceleration in the seismicity study is greater than that assumed in the <br />preliminary design, the final project design analysis will make modifications needed to meet <br />the factor of safety (determinations may be subject to the approval of the CIWMB and/or <br />RWQCB). Impacts to the new liner and drainage system installed over the Austin Road <br />Landfill will be monitored as appropriate based on any stipulations of the CIWMB and/or <br />RWQCB. <br />57 (G.4) <br />Proposed as Part of the Project: <br />Overall reduction—or, in some cases, elimination or Improvement --of slope instability at the <br />project site can be achieved through the implementation of the seismic design measures <br />designed to meet CCR Title 27. <br />M. 58 (G.5) <br />Proposed as Part of the Project: <br />The applicant's Joint Technical Document references an erosion management plan that <br />delineates various actions to minimize erosion and sedimentation, including appropriate <br />construction, landscaping, and maintenance of graded slopes and subsurface drainage <br />systems. As part of that plan, grading operations will be scheduled to avoid the rainy season <br />and be implemented by interim engineering control measures. Before grading is stopped, <br />San Joaquin County UP -00-7, ER-00-21Forward, Inc. <br />Community Development Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.