Laserfiche WebLink
occurs. The conditions of the active faces of a landfill, as well as the leachate generated, <br />must be monitored and professional judgment utilized at all times to keep these two factors in <br />balance. <br />g. 18 Forward 1993 (D2) <br />Portions of the site that either have been filled to the extent allowed or are not expected to be <br />worked for extended periods (six months or longer) shall be sown v,,&h fast -germinating <br />drought -tolerant grass seed and watered until a cover of vegetation is established. <br />h. 19 Austin 1994 (Gl.b), Austin 2000 (G1,b) (similar) <br />The project sponsor shall seek to minimize the extent of area exposed to wind erosion. <br />Exposed surfaces, including stockpiles, shall be vegetated to the extent possible. <br />i. 20 Austin 1994 (Gl,c), Austin 2000 (G1,c) <br />Plan and phase construction and closure operations such that they do not take place <br />simultaneously on dry windy days. Schedule particularly dusty act; kites on separate days. <br />j. 21 Austin 1994 (GIA), Austin 2000 (G1 -c9 <br />Design the site filling plan to facilitate screening of the active face from the prevailing winds, <br />whenever possible, to minimize the amount of windblown dust released from the working <br />face. <br />k. 22 Austin 1994 (G1.e), Austin 2000 (G1.e) <br />Haul trucks carrying easily airborne material shall be covered during transport and sprayed <br />with water prior to dumping if it Is shown that this would reduce dust emissions during off- <br />loading activities within the landfill. <br />1. 23 Austin 1994 (G1.0, Austin 2000 (G1.0 <br />The landfill operator shall restrict truck and equipment travel over /oase, uncompacted, <br />unpaved surfaces. <br />m. 24 Forward 1993 (D5) <br />A particulate/meteorological monitoring station should be installed on the project site, <br />preferably near the site boundary with one of the closer residenffaf receptors. This monitoring <br />station should be operational for a minimum of six months during fhe dy season (April - <br />September) before landfill activity begins to intensify as a result ofpruied implementation. <br />Data should be collected daily during this baseline period, during f1xe taadfili's transition to <br />higher project -related activity levels, and during the landfill's peak operational phases <br />thereafter. If the more intensive landfill operations are found to fixrernent the 24 --hour <br />average of the annual average PM10 levels by more than 5 ug4773 ober baseline, <br />respectively, even with the implementation of all the above-merifforxed dust controls, further <br />dust control measure and/or limits on the amount of waste received at the site may be <br />necessary to control PM10 impacts. <br />n. 25 Forward 1993 (DB) <br />Forward, Inc. shall schedule regular deliveries of waste at the landfill to minimize queuing and <br />idling. <br />o. 26 Austin 1994 (G2.b), Austin 2000 (G2,b) <br />The idling of all internal combustion equipment shall be limited to ten minutes at any given <br />time, <br />San Joaquin County UP -00-7, ER-M2lForward, Inc. <br />Community Development Page 20 <br />