Laserfiche WebLink
C'onrrolidaled Forward Landfill Project- Mitigation I)118t4)r117 �I. and Reporting <br />a ortinl; I'ro};rant Chrct<Iir+t <br />Pnge 24 <br />MItigutton Measure Intl>lcttlCl►tatlUll Monitoring Lnlalcn►cn1t11Jan <br />. <br />ConIIrmatfon Comments <br />MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST <br />INTRODUCTION: <br />This Mitigation Monitoring and Reporting Program Checklist includes mitigation measures identified in this EIR, as well as mitigation measures from three <br />previous EIRs prepared for the project site, identified below as "Forward 1993", 'Austin 1994", and "Austin 2000". These three previous EIRs are discussed in <br />more detail in the introduction to Attachment I Mitigation Measures, above. <br />Mitigation measures are grouped by the impact categories used in this EIR, and numbered sequentially. <br />Mitigation Measures from this ETR are printed in normal font, with the original Mitigation Measure numbers from this EIR following in (parentheses). <br />measures from the three previous EIRs are printed in italics and identified by their source (Forward'1993, Austin 1994, or Austin 2000), followed b the Mitigation <br />Measure number in the relevant EIR. Because some impacts in this EIR and in previous EIRS do not require mitigation measures, the original Mitigation <br />numbers are not sequential. y g t3°n <br />gt mitigation measure <br />In some cases, mitigation measures from two or more of the previous INRs that are sul)9tFintially Similar Ill content, or have been a )clnted with <br />changed, have been combined. 'These mitigation measures are identified as "similar" and/or "updated". Mitigation measures from the dlree ore otht Otherwise being <br />have been replaced by equivalent measures in this EIR, or have already been implemented, are excluded from the Iist below. previous EIRs that <br />A. LAND USE, PLANS, <br />AND POLICIES <br />1 (A-3) Bird T lazards <br />Continue existing <br />bird control n)casures <br />Responsibility: Landfill operator <br />'Tinting: Ongoing <br />Limit surface of ponds Responsibility: Landfill operator <br />Timing: The area of proposed and <br />existing ponds shall be shown on any <br />grading permits submitted to the <br />County <br />Bird survey Responsibility: Landfill operator <br />'1'i111in9:. Upon upproval of Us,, Permit <br />and prior to approval of -business license <br />1tesponsibilily: Salt Joliquin County <br />1?nvironanental Ileaith I>cparimcnl <br />"Timing: During monthly site visits <br />Responsibility: RWQCB <br />"Timing: Prior to approval of Waste <br />Discharge Requirements (WDRs) <br />Responsibility: San Joaquin County <br />l.;nviramtnental Ilcalth Department <br />Timing: Prior to approval of <br />business license <br />