Laserfiche WebLink
is <br />dfill Project — Mitigation Monitoring and Reporting Program Checklist <br />Consolidated Forward Lan j g <br />Mitigntion Measure <br />7 Forward 1993 (1;3) <br />Sound wall at 9690 <br />Austin Road <br />8 1 orwrard 1993 (L 0 <br />Quietest available <br />Equipment <br />9 Forward 1993 (E2) <br />Maintain mufflers <br />Implementation <br />Respunsibilily: landfill operator <br />Timing: If anti when requested <br />Responsibility: Landfill operator <br />Timing: Ongoing <br />Responsibility. Landfall operator <br />Timing: Ongoing <br />10 Aluvtill 1994 (111.(►) (vinllla►), Austin 2000 (111.x) <br />Conform to Counly Responsibility Landoll operator <br />noise standards Timing: Ongoing <br />11 Austin 1994 (Ill. b), Austin 2000 (111. b) <br />Setbacks and limits Responsibility: Landfill operator <br />on hours Timing: Ongoing <br />Monitoring <br />Responsibility: San Joaquin County <br />Community Development Department <br />Timing: If and when requested <br />Responsibility: San Joaquin Courcy <br />Community Development Department <br />Timing: Annually and on a complaint <br />basis <br />Responsibility: San Joaquin County <br />Community Development Department <br />Timing: Annually and on a complaint <br />basis <br />Responsibillty: Sun -10(11111111 t:01a11y <br />Community Development Department <br />Tinting;: Annually, and on (1 complaint <br />basis <br />Responsibility: San Joaquin County <br />Community Development Department <br />Timing: Annually, and on a complaint <br />basis <br />D. AIR QUALIWODORS <br />12 (D.2) Landfill gas recovery Responsibility: Landfill operator <br />Responsibility: San Joaquin Valley <br />at Forward Landfill Timing: As determined by SJVAPCD <br />Air Pollution Control District <br />(before gas release rate from <br />Timing: Quarterly monitoring of gas <br />all sources exceeds 150 cfm) <br />release rate; implement when gas release <br />rate from all sources exceeds 150 cfm <br />13 (D.4) Dust control Responsibility: Landfill operator <br />operational measures Timing: Throughout life of project <br />Responsibility: Sari Joaquin Valley <br />Air Pollution Control District <br />Timing: Quarterly <br />Dust control (all- Responsibility: Landfill operator Responsibility: San Joaquin Valley <br />Implementation <br />Confirmation Comments <br />