Laserfiche WebLink
Consolidated Forward Landfill Project — Mitigation M.._.. .ring and Reporting Program Checklist 9 <br />Mitigation Measure <br />from Prevailing 11411(ly <br />Implementation <br />Timing: Ongoing <br />22 Austin 1994 (Gl.e),Austin 2000 (Gl.e) <br />Cover and spray easily Responsibility: Landfill operator <br />airborne material Timing: Ongoing <br />23 Austin 1994 (GI.j),Austin 2000 (GI. -O <br />Restrict travel over loose, Responsibility: Landfill operator <br />uncompacted surfaces Timing: Ongoing <br />24 Forward 1993 (DS) <br />Monitoring station; <br />further dust controls <br />25 Forward 1993 (1)0) <br />Sehe•drile deliveries <br />Monitoring <br />Air Pollution Control District <br />T lnuing: Quarterly <br />Responsibility: San Joaquin Valley <br />Air Polhuion: Control District <br />Tinning: Quarterly <br />Responsibility: San Joaquin Valley <br />Air Pollution Control District <br />Timing: Quarterly <br />Responsibility. Landfill operator Responsibility: San Joaquin Valley <br />Timing: Monitoring station shall be Air Pollution Control District <br />shown in Improvement Plan; daily Timing: Quarterly <br />sampling; further measures as required by <br />SJVAPCD <br />Responsibility: Lezndf111 operator <br />Tinning: Ongoing <br />26 Austin 1994 ((;2.1)),Auslin 2000 (G2.1)) <br />I.lmlt Irlllnl; to tell Responsibility: Lantf flll operator <br />Minutes 77111/111;: (Aul;oing <br />27 Austin 1994 (G2.u),Atavtin 2000 <br />(G2.(t) <br />Maintain all internal <br />Responsibility: Landfill operator <br />combustion equipment <br />Timing: Ongoing <br />28 Forward 1993 (D8) <br />Cover VOC- <br />Responsibility. Landfill operator <br />contaminated soil <br />Timing. Ongoing <br />Responsibility San Joaquin Volley <br />Air Pollution Control District <br />Timing: Quarterly <br />Resl)onsibibtY:.San.lorreli n VallPv <br />/f/1- Pollution Control Pistricl <br />77111/111;: Qtforte'1•11, <br />Responsibility: Sun Joaquin Valley <br />Air Pollution Control District <br />Timing: Quarterly <br />Responsibility: San Joaquin Valley <br />Air Pollution Control District <br />Timing. Quarterly <br />Implementation <br />Confirmation Comments <br />