Laserfiche WebLink
0 0 i <br />Consolidated Forward Landfill Project - Mitigation Monnoring and Reporting Program Checklist .. is <br />Mitigation Measure <br />Implementation . <br />llydrants and water Responsibility: Landfill operator Responsibility: San Joaquin County <br />source Timing: Witter source shall be shown on $nvironmental Ilealth Department <br />Improvenrent Plan Timing: Prior to appi•owd of Improvement <br />Plan <br />43 Forward 1993 (A. H) <br />Balance ash control and Responsibility: Landfill operator <br />leachate generation Timing: Ongoing <br />F. HYDROLOGY AND WATER QUALM <br />44 (F.1) Drainage controls Responsibility: Landfill operator <br />Timing: Letter Prom RWQCB shall be <br />included with the Improvement Plan <br />Channel reconfig- <br />Responsibility: Landfill operator <br />uration and berms <br />Timing: Letter from RWQCB shall be <br />included with the Improvement Plan <br />Replacement <br />Responsibility: Landfill operator <br />floodplain <br />Timing: Letter from RWQCB shall be <br />included with the Improvement Plan <br />Channel and <br />Responsibility: Landfill operator <br />floodplain design <br />Timing: Letter from RWQCB shall be <br />included with the Improvement Plan <br />45 (F.2) Structural erosion <br />Responsibility: Landfill operator <br />controls <br />Timing: Letter from RWQCB shall be <br />included with the Improvement Plan <br />Operational erosion Responsibility: Landfill operator <br />controls Timing: Ongoing <br />Revegetation Responsibility: Landfill operator <br />Timing: Upon completion of cell <br />46 (F.1) Liner amt leachate Responsibility: Landfill* operator <br />collection system Timing: Letter from RWQCB shall be <br />Responsibility: San Joaquin County <br />Environmental Health Department <br />Timing: During monthly site visits <br />Responsibility: RWQCB <br />Timing: Prior to issuance of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB <br />Timing: Prior to issuance of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB <br />Timing: Prior to issuance of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQC13 <br />Timing: Prior to issuance of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB <br />Timing: Prior to issuance of <br />Waste Discharge Requirements (WDRs) <br />Responsibility: RWQCB <br />Timing: Annually <br />Responsibility: RWQCB <br />Timing: Annually <br />Responsibility: RWQCB <br />Timing: Prior to issunnrc of <br />Implementation <br />Confirmation Comments <br />