Laserfiche WebLink
ATTACT3�N'T E <br />40 CONSOLIDATED FORWARD LANDFILL PROJECT <br />FINAL ENVIRONMENTAL LMPACT REPORT <br />ERRATA <br />The Heading "E. Public Health and Safety" «'as inadvertently omitted from Tablell-1, p.- <br />11 of the FEIR. <br />In addition, the first paragraph under 'Proposed as Part of the Project" on that page, as <br />well as the paragraph extending from the bottom of page 129 onto the top of p. 130, and <br />the first paragraph under "E. Public Health and Safety" on p. 7 of Appe-ndix G, <br />Mitigation Monitoring and Reporting Program" in the FEIR are all corrected for clarity <br />to read as follows: <br />Use a total of 17 pieces of equipment (at anygiven time) over the life q --the project to <br />minimize particulate discharge. As sho-u-n in Table IV.EA, (FEIR, p 129), the risk from <br />particulate - and specifically diesel fortes — m7I be lessened for the prey- ct versus the <br />baseline conditions. The existing 28 pieces M'diesel powered landfall oT�erating equipnent <br />Will be changed out every 5 years at Farrand and every 10 years at Au tin, and avould he <br />reduced to a total of 17 pieces of equipment doer a 15 -year or fewer. <br />In addition, the last paragraph on page 128 is corrected to read as follosti s: <br />The risks are considered to be reduced in the proposed project conaparre: to the baseltrte <br />permit conditions because: 1) A lesser arnmint of particulate generating equipment used <br />per ton disposed of 2) Waste avill be Humeri aver a shorter period of time (14 versus 30 in <br />years) and daily hours of equipment openziian will be only slightly increased rather than <br />proportionally increased (10.5 versus 9.0 hours per day), and; 3) the risk protocols <br />evaluates exposure over a 30 -year timefimme and the project avould only result in diesel <br />emissions for 14 years while the continued ZmLl-level operations ofAustin Road landfill <br />under existing permits would occur for the entire 30- year exposure period. <br />The FEIR inadvertently had 30 -year lifetimes for both the proposed project and existing <br />Austin Road landfill. The proposed project would have a 14 -year operational lifespan. <br />The minutes of the San Joaquin County FLmudng Commission's October 3, 2002 Hearing <br />on the Draft Environmental Impact Report (EIR) for the Consolidated Forward Landfill <br />Project were inadvertently omitted from Section IX, Comments and Responses, of the <br />Final Environmental Impact Report. Those minutes are attached and incorporated bN <br />reference into the Final EIR as Item A(1) following page 236 of the Final EIR. Because no <br />environmental issues or questions are raised in the Commissioners' comments, no <br />response is required. <br />