Laserfiche WebLink
Facility -wide Requirements for N-339-0-2 (continued) Page 4 of 4 <br />06. The permittee shall submit certifications of compliance with the terms and standards contained in Title V e it <br />V rm t s, <br />including emission limits, standards and work practices, to the District and the EPA annually (or more frequently as <br />specified in an applicable requirement or as specified by the District). The certification shall include the identification <br />of each permit term or condition, the compliance status, whether compliance was continuous or intermittent, the <br />methods used for determining the compliance status, and any other facts required by the District to determine the <br />compliance status of the source. [District Rule 2520, 9.16] Federally Enforceable Through Title V Permit <br />37. The permittee shall submit an application for Title V permit renewal to the District at least six months, but not greater <br />than 18 months, prior to the permit expiration date. [District Rule 2520, 5.2] Federally Enforceable Through Title V <br />Permit <br />38. When a term is not defined in a Title V permit condition, the definition in the rule cited as the origin and authority for <br />the condition in a Title V permits shall apply. [District Rule 2520, 9.l .11 Federally Enforceable Through Title V <br />Permit <br />39. Compliance with permit conditions in the Title V permit shall be deemed in compliance with San Joaquin County Rule <br />1 10. A permit shield is granted from these requirements. [District Rule 2520, 13.21 Federally Enforceable Through <br />Title V Permit <br />40. Compliance with permit conditions in the Title V permit shall be deemed in compliance with the following applicable <br />requirements: SJVtJAPCD Rules 1100, sections 6.1 and 7.0 (12/17/92); 2010, sections 3.0 and 4.0 (12/17/92); 2031 <br />(12/17/92); 2040 (12/17/92); 2070, section 7.0 (12/17/92); 2080 (12/17/92); 4101 (2/17/05); 4601 (12/17/09); 8021 <br />(8/19/2004); 8031 (8/19/2004); 8041 (8/19/2004); 8051 (8/19/2004); 8061 (8/19/2004); and 8071 (9/16/2004). A <br />permit shield is granted from these requirements. [District Rule 2520, 13.2] Federally Enforceable Through Title V <br />Permit <br />41. The reporting periods for the Report of Required Monitoring and the Compliance Certification Report begin June 1 of <br />every year, unless alternative dates are approved by the District Compliance Division. These reports are due within 30 <br />days after the end of the reporting period. [District Rule 2520] Federally Enforceable Through Title V Permit <br />42. No air contaminant shall be released into the atmosphere which causes a public nuisance. [District Rule 41021 <br />.7 <br />These terms and conditions are part of the Facility -wide Permit to Operate. <br />Facility Name FORWARD, INC LANDFILL <br />Location 9999S AUSTIN ROAD.MANTECA CA 95336 <br />