Laserfiche WebLink
ermit Unit Requirements for N-339-17-8 (continued) <br />Af <br />Page 2 of 9 <br />3. Source testing on the flare shall be performed to demonstrate compliance with the NOx and CO limits, and the VOC <br />destruction efficiency of 98% as required by this permit shall be conducted annually. [District NSR Rule] Federally <br />Enforceable Through Title V Permit <br />14. Source testing for NOx shall be conducted using CARB Method 7 or Method 20. [District Rule 1081 ] Federally <br />Enforceable Through Title V Permit <br />15. Source testing for CO shall be conducted using EPA Method 10 or 1 OB, CARB Methods 1 through 5 with 10, or <br />CARB Method 100. [District Rule 1081 ] Federally Enforceable Through Title V Permit <br />16. VOC emissions shall be measured by EPA Method 18 or 25. [District Rule 1081 ] Federally Enforceable Through Title <br />V Permit <br />17. H2S concentration of the influent landfill gas to the flare shall not exceed 46.9 ppmv. [District NSR Rule] Federally <br />Enforceable Through Title V Permit <br />18. Gas combusted in the flare shall be tested for H2S content on a quarterly basis using draeger tubes. If compliance is <br />shown for two consecutive quarters, the testing frequency may be changed to annual. Quarterly testing shall resume if <br />any annual test shows noncompliance. [District Rule 1081 ] Federally Enforceable Through Title V Permit <br />19. Carbon canister on condensate storage tank vent shall be inspected monthly for breakthrough with a District -approved <br />portable analyzer. [District NSR Rule] Federally Enforceable Through Title V Permit <br />20. The gas collection system shall be operated in such a manner that the surface emissions testing of the landfill shows <br />the concentrations of total organic compounds (measured as methane) do not exceed 1,000 ppmv at any point on the <br />surface of the solid waste disposal site or along the gas transfer path of the gas collection system. Sampling ports shall <br />be installed on each well head. [District NSR Rule] Federally Enforceable Through Title V Permit <br />1911111111111� I . Gas collection system shall be operated in a manner which maximizes the amount of landfill gas extracted while <br />preventing overdraw that can cause fires or damage the gas collection system. [District NSR Rule] Federally <br />Enforceable Through Title V Permit <br />22. During maintenance of the gas collection system or incineration device, emissions of landfill gas shall be minimized <br />during shutdown. [District NSR Rule] Federally Enforceable Through Title V Permit <br />23. Maintenance is defined as work performed on a gas collection system and/or control device in order to ensure <br />continued compliance with District rules, regulations, and/or Permits to Operate, and to prevent its failure or <br />malfunction. [District NSR Rule] Federally Enforceable Through Title V Permit <br />24. The gas collection system shall be operated such that the concentration of total organic compounds (as CH4) shall not <br />exceed 1,000 ppmv at any point along the gas transfer path of the gas collection system. [District NSR Rule] Federally <br />Enforceable Through Title V Permit <br />25. The entire gas collection system shall be inspected for leaks with a portable analyzer in accordance with EPA Method <br />21 at least quarterly. After four successful inspections, the frequency shall be annually. If a leak is detected, quarterly <br />inspections shall resume. A leak is defined as a measurement in excess of 1,000 ppm (measured as methane) above <br />background when measured at a distance of one (1) centimeter from the potential source. Leaks shall be repaired <br />within 15 calendar days after it is detected. [District NSR Rule] Federally Enforceable Through Title V Permit <br />26, The permittee shall notify the APCO by telephone at least 24 hours before performing any maintenance work that <br />requires the system to be shutdown. The notification shall include a description of work, the date work will be <br />performed and the amount of time needed to complete the maintenance work. [District NSR Rule] Federally <br />Enforceable Through Title V Permit <br />27. Permittee shall maintain records of system inspections including: date, time and inspection results. [District Rule 1070] <br />Federally Enforceable Through Title V Permit <br />8. Permittee shall maintain records of maintenance related or other collection system and control device downtime, <br />including individual well shutdown. [District Rule 1070] Federally Enforceable Through Title V Permit <br />PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE <br />These terms and conditions are part of the Facility -wide Permit to Operate. <br />Facility Name. FORWARD, INC LANDFILL <br />Location 9999 S AUSTIN ROAD MANTFnA C,A oszu <br />