My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:38:44 PM
Creation date
7/3/2020 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions for N•339-17-10 (continued) Page 6 of 9 <br />64. For the purpose of demonstrating whether the bas coh"tion system flow rate is sufficient to determine cumpliance <br />with 60.752(h)(2xiixA)(3), the owner or operator shall treasure gauge Pressure in the gas coUeetion header at each <br />indiviJuril well, monthly if a positive pressure exists, action shall be initiated to con•ex;t the cxcccdane;c within 5 <br />calendar days, except for the three conditions allowed under 60.753(b). If negative pressure cannot be achieved <br />without excess air infiltration within 15 calendar days of the finis measurement, it e gas collection system shall he <br />expanded to correct the exceed,uce within 120 days of the initial mcasurement of positive pressure. Any attempted <br />corrective measure Shull not cause exceedarices of other operational or performance staudanls. Ail attemative timeline <br />for correcting the exceedance may be submitted to the APCO for approval. (40 CFR 60.755(a)(3)] Federally <br />l7nforceahle Through Title V permit <br />65 Owners or operators are not rcyuircd to expand the system as required in patugraph 60.755(a)(3) during the first 180 <br />slays after grts culluetiou system startup. [40 (TR 60.755(x)(4)) Federally Enforccrtblc Thruugh Title V Permit <br />66. For the purpose of identifying whether excess air infiltration into the laodtll is occurring, the owner or operator shall <br />monitor each well monthly for temperature and rti'Jogen or oxygen as provided in 60.753(c). If a well excctxls enc of <br />these operating parameters, action shall be initiated to correct the exceedance within 5 calendar days, if correction of <br />the exceedance cannot be achieved within 15 calendar days of the first measurement, the gats collection system shall be <br />expanded to correct the exceeda+ncc within 120 days of the initial exceedance. Any attempted corrective measure shall <br />not cause exceedance of other operational or performance standards. An alternative timeline for corrected in the <br />ext c:dancc may be submitted to the APCO for approval [40 CFR 60.755(a)(5)) Federally Enforceable'1'hruugh'l itis <br />V Permit <br />67 The provisions of this subpart apply at all times, except during periods of start-up, shutdown, or malfunction, provided <br />that the duration of start-up, shutdown, or malfunction shall not exceed 5 days for collection systems and shall not <br />exceed i hour for treatment or control devices [40 CFR 60.755(c)] Federally Enforceable Through Title V 11cnnit <br />68. Surface testing shill be performed on a quarterly basis using; an organic vapor analyzer, flvne ioui?_iUon detector, or <br />other portable monitor meeting the s-po cifications provided in 40 CFR 60.755(d). [40 CPR 60.755(e)(1)] Federally <br />Enforceable Tluough Title V Permit <br />69. The background concentration shall be determined by moving the probe inlet upwind and downwind outside the <br />boundary of the landfill at a distance of at !cast 30 meters from the perimeter wells. (40 CFR 60.755(c)(2)) Federally <br />F-nkm cable Thruugh'hille V Permit <br />70 Surface emission monitoring shall be performed in accordance with section 4.3.1 of Method 21 of appendix A, except <br />that the probe inlet shall be placed within 5 to 10 centimeters of the ground, Monitoring shall be perfoimed during <br />typical meteorological conditions, Any reading of 500 parts per million or more above background at any location <br />shall be rucordcd as a monitntrd exceedance and the actions specified in 40 CFR 60.755(c)(4xi-v) shall be taken. As <br />long as the specified actions are taken, the exceedance is not a violation of the uperationid rcquircme.�nts of 60.753(d), <br />[40 CFR 60.755(c)(3), (4)] Federally Enforceable Through Title V Pennit <br />71, Permittee shall implement a program to monitor for Cover integrity and implement cover repairs as necessity on a <br />monthly basis. (40 CFR 60.755(c)(5)] Federally Enforceable Tltrouglt Title V Pennit <br />72 The portable analy7.er shall meet the instrument specifications of Method 21, section 3 (except that "methane" shall <br />replace all references to VOC). The calibration gas shall be rrtcthane, diluted to a nominal concentration of 500 parts <br />per million in air. To meet the perfurmnnce evahiation requireiments of Method 21, section 3.1.3, the instrument <br />evaluation procedures of Method 21, section 4.4 shall be used, The calibration procedures provided in Method 21, <br />section 4.2 shall be followed immediately before commencing a surface monitoring survey. The provisions of this <br />condition apply at all times, except during periods of start-up, shutdown, or malfunction which shalt not exceed 5 days <br />for collections systems and shall not exceed I hour for treatment or control devices. (40 CFR 60.755(d), (e)] Federally <br />Enforceable Through tide V Permit <br />73. Each wellhead sbull have a sampling port and a thermometer, other temperature -measuring device, or an access pots <br />for temperature measurements, [40 CPR 60.756(a)] Federally Enforceable Through Title V Permit <br />74. The cnclosed flare shall be equipped with a temperature monitoring device equipped with a continuous recorder and <br />having a minimum accuracy of:El percent of the temperature being measured expressed in degrees Celsius or t 0 5 <br />degrees Celsius, whichever is greater. (District NSR Rule, 40 CFR 60.756(h)(1)] Federally Enforceable Through Title <br />V Permit <br />CONd)1'1710NS CONTINUE ON NEXTPAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.