My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2014_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:38:44 PM
Creation date
7/3/2020 10:58:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2014_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2014-0006 -37- <br /> FORWARD INC.AND REPUBLIC SERVICES INC. <br /> FORWARD CLASS 11 LANDFILL <br /> SAN JOAQUIN COUNTY <br /> Task Compliance Date <br /> A. Construction Plans <br /> Submit construction and design plans for review and 90 days prior to <br /> approval. (see all Construction Specifications in proposed construction <br /> Section D, above and Section F of the SPRRs.) <br /> B. Construction Report <br /> Submit a construction report for review and approval 60 days prior to <br /> upon completion demonstrating construction was in proposed discharge <br /> accordance with approved construction plans (see <br /> Standard Construction Specification F.27 in the <br /> SPRRs). <br /> C. Final Closure Plans <br /> Submit a final or partial final closure and post-closure Two years prior to <br /> maintenance plan, design plans, and CQA plan for closure <br /> review and approval (see all Closure and Post- <br /> Closure Specifications in Section E, above and <br /> Section G of the SPRRs). <br /> D. Unsaturated Zone Monitoring System <br /> Submit a report that reviews the status of the 1 June 2014 <br /> unsaturated zone monitoring system. The report <br /> should document those monitoring points that need <br /> repair or replacement, consider the need for <br /> additional monitoring points and should establish a <br /> time schedule to completely restore the monitoring <br /> system. <br /> E. Closure and Postclosure Maintenance Plan <br /> Submit a revised Closure and Postclosure 1 June 2014 <br /> Maintenance Plan with closure stages dates. The <br /> revised Plan must include revised cost estimates for <br /> Closure Financial Assurances. <br /> F. Update Corrective Financial Assurance Cost <br /> Estimate <br />
The URL can be used to link to this page
Your browser does not support the video tag.