Laserfiche WebLink
r7 <br />L --A <br />GeoLogic Associates <br />Geologists, Hydrogeologists and Engineers <br />LILIJ M17A M' tj 02 WAIN 11011 N 1. 1 <br />1.0 INTRODUCTION ........................................................................................ I <br />2.0 INHERENT PROTECTION AFFORDED BY THE SINGLE <br />COMPOSITELINER ................................................................................. 2 <br />2.1 GENERAL ......................................................................................... 2 <br />2.2 FML (FLEXIBLE MEMBRANE LINER) .........................................2 <br />2.3 COMPACTED CLAY LINER ..........................................................3 <br />2.4 LCRS (LEACHATE COLLECTION AND REMOVAL <br />SYSTEM) ......................... ............... ................................................ 5 <br />3.0 AINTICIPATED PERFORMANCE OF A SINGLE COMPOSITE <br />LINERAT FORWARD .............................................................................. 5 <br />3.1 PROPOSED FORWARD LINER DESIGN ......................................5 <br />3.2 LEACHATE VOLUME ..................................................................... 6 <br />3.3 LEACHATE CHEMISTRY..............................................................6 <br />3.4 DILUTION -ATTENUATION CHARACTERISTICS OF THE <br />PROPOSED SINGLE COMPOSITE LINER ....................................7 <br />3.5 LYSIMETER IMPACTS ............................................ -- ............... —7 <br />4.0 MITIGATING SITE CHARACTERISTICS ............................................7 <br />4.1 CLIMATE .......................................................................................... 8 <br />4.2 GEOLOGY/HYDROGEOLOGY ......................................................8 <br />5.0 EXISTING RELEASE CHARACTERISTICS ........................................ 9 <br />6.0 SUPERIOR SITE OPERATIONS ............................................................. 10 <br />6.1 OPERATIONS HISTORY ......... .................................. ................... 11 <br />6.2 PROPOSED CONSTRUCTION QUALITY ASSURANCE <br />(CQA)PROTOCOLS ........................................................................ 11 <br />6.3 ADDITIONAL SITE CONTROLS ....................................................13 <br />6.4 SITE MONITORING ............ .................. ......................................... 16 <br />7.0 COST BENEFIT .......................................................................................... 18 <br />8.0 CONCULSION .......................................................... I ................................. 18 <br />1831 Commercenter East, San Bernardino, CA 92408 Phone: (909) 383-8728 Fax: (909) 383-8732 <br />