|
0 0LITERATURE
<br />Existing Forward Landfill Reports (Cot')
<br />80. LSA, Final Environmental Impact Report, Forward, Inc. Landfill Use Permit
<br />Modifications, March 1993.
<br />81. Levine -Fricke, 2000 Fourth Quarter and Annual Environmental Monitoring Report,
<br />Forward Landfill, February 2001.
<br />82. Moju Environmental Technologies, Contaminated Soil Acceptance Program,
<br />Forward, Inc. Landfill, 1990.
<br />83. Moju Environmental Technologies, Alternative Daily Cover at Forward Landfill, San
<br />Joaquin County, Evaluations and Findings, 1990.
<br />84. SCS Engineers, New Source Performance Standards, Tier H Sampling, Analysis, and
<br />Landfill NMOC Emission Estimates, Forward Landfill, January 1999.
<br />85. Vector Engineering, Final Construction Quality Assurance Report for WMU D-98
<br />and the WMU D-94 Extension at the Forward, Inc. Landfill, January 1999.
<br />86. Vector Engineering, Final Construction Quality Assurance Report for WMU D-99,
<br />Class 11 Leachate Impoundment, and Closure of the Eastern Ash Pit at the Forward,
<br />Inc. Landfill, September 1999.
<br />87. Woodward -Clyde Consultants, Oakland Federal Building Project, Proposed
<br />Bioremediation of Soil at the Forward Landfill, 1990.
<br />Existing Austin Road Landfill Reports
<br />88. Camp Dresser & McKee, Austin Road Landfill Draft Weather Operations Plan,
<br />September 1998.
<br />89. Camp Dresser & McKee, Austin Road Landfill Contaminant Plume Characterization
<br />Report, January 1999.
<br />90. Camp Dresser & McKee, Storm Water Pollution Prevention Plan, Austin Road
<br />Landfill, February 1999.
<br />91. Camp Dresser & McKee, Groundwater Corrective Action Feasibility Study Report,
<br />Austin Road Landfill, April 1999.
<br />92. CH2M HILL, First Quarter Monitoring Report, Austin Road Landfill, April 1998.
<br />93. CH2M HILL, Third Quarter Air Monitoring Report, Austin Road Landfill
<br />Groundwater Treatment Facility, October 1998.
<br />94. CH2M HILL, Third Quarter Monitoring Report, Austin Road Landfill Groundwater
<br />Treatment Facility, October 1998.
<br />95. CH2M HILL, Third Quarter Soil Gas Monitoring Report, Austin Road and French
<br />Camp Landfill, October 1998.
<br />96. CH2M HILL, Third Quarter Monitoring Report, Austin Road Landfill, October 1998.
<br />97. CH2M HILL, Fourth Quarter Air Monitoring Report, Austin Road Landfill
<br />Groundwater Treatment Facility, January 1999.
<br />98. CH2M HILL, Fourth Quarter Monitoring Report, Austin Road Landfill Groundwater
<br />Treatment Facility, January 1999.
<br />99. CH2M HILL, Fourth Quarter Soil Gas Monitoring Report, Austin Road and French
<br />Camp Landfill, January 1999.
<br />-4-
<br />CA2000-048\17orward Composite Liner V3.docW9/19102
<br />Geologic Associates
<br />
|