Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO.R5-2014-0006 9 <br /> FORWARD INC.AND REPUBLIC SERVICES INC. <br /> FORWARD CLASS 11 LANDFILL <br /> SAN IOAQUIN COUNTY <br /> 3) For receiving waters: <br /> a) Floating and suspended materials of waste origin - presence or <br /> absence, source, and size of affected area; and <br /> b) Discoloration and turbidity - description of color, source, and size <br /> of affected area. <br /> Results of Standard Observations shall be submitted in the quarterly <br /> monitoring reports required in Section B.1 of this MRP. <br /> 7. Compost Facility Monitoring <br /> The Discharger shall monitor the Compost Facility quarterly. Samples of <br /> retention basin liquid, leachate (when present) from compost stockpile areas <br /> and leachate from active compost windrows shall be collected and analyzed for <br /> the monitoring parameters listed in Table 111. The volume of incoming material <br /> for composting and the volume of compost produced shall be recorded monthly <br /> and reported in the Annual Report. <br /> 8. Cannery Waste Land Application Area Monitoring <br /> The Discharger shall collect representative soil samples from the land <br /> application areas at the beginning and end of each cannery season; and daily <br /> wet weight and weekly composite waste samples from each cannery waste <br /> source. Less frequent composite sampling may be permitted on approval by <br /> the Executive Officer based on the results from the initial season of monitoring <br /> and on the Cannery Waste Water Quality Protection Standards Report (due 1 <br /> September 2014). The soil and composite waste samples shall be analyzed for <br /> biochemical oxygen demand (BOD), total dissolved solids, and total nitrogen. <br /> In addition, the weekly total mass of nitrogen applied per acre shall be <br /> calculated and reported in the Quarterly Reports. At the end of the cannery <br /> season, the total mass of nitrogen per acre must be determined and a crop that <br /> will uptake 100% of the nitrogen must be planted, grown and harvested before <br /> the next cannery season. An annual land application monitoring summary shall <br /> be reported in the Annual Report. In addition, the following monitoring shall be <br /> conducted: <br /> Land application areas shall be inspected prior to discharge of putrescible <br /> cannery solids and non-putrescible rinsate/wastewater, and observations from <br /> those inspections shall be summarized for inclusion in the quarterly monitoring <br /> reports. The following items shall be noted in daily pre-application inspections: <br /> i. Evidence of erosion; <br /> ii. Berm condition; <br /> iii. Condition of flow control structure/valve (if any); <br />