Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO. R5-2014-0006 11 <br /> FORWARD INC.AND REPUBLIC SERVICES INC. <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> The Discharger shall conduct corrective action monitoring to demonstrate the <br /> effectiveness of corrective action in accordance with Title 27, section 20430, all <br /> approved corrective action monitoring programs and this MRP. Groundwater <br /> monitoring wells and unsaturated zone monitoring points that are in a corrective <br /> action monitoring program shall be monitored in accordance with the <br /> groundwater and unsaturated zone monitoring requirements in parts A.1 and <br /> A.2 of this MRP. The corrective action monitoring wells shall be monitored for <br /> the same parameters at the same frequency as the detection monitoring wells. <br /> The current groundwater extraction well network is listed below. Additional <br /> extraction wells may be installed, and if so, they shall be monitored in the same <br /> manner as the wells listed below. <br /> Extraction Well Zone Modules Being Addressed <br /> EW-1 Shallow Austin Road Unit <br /> EW-2 Shallow Austin Road Unit <br /> EW-3 Shallow Austin Road Unit <br /> EW-3R Shallow Austin Road Unit <br /> EW-4 Shallow Austin Road Unit <br /> The Discharger shall monitor the performance of corrective actions and shall <br /> include in each quarterly report the following: <br /> a. record the total hours of operation of all remediation systems/per day <br /> (estimated for holidays and weekends); <br /> b. the exact time of any system failure and restart; <br /> c. a description of any repairs; <br /> d. an evaluation of the performance of the extraction points (both landfill <br /> gas and groundwater); <br /> e. the volume of water discharged from the system; <br /> f. the mass of contaminates removed by the gas extraction system and the <br /> groundwater extraction system; and <br /> g. the location of discharge of the treated water. <br /> A copy of any notifications shall be included in the facility operating record. A <br /> summary of the corrective action performance data shall be a part of the <br /> quarterly report. <br /> B. REPORTING <br /> The Discharger shall submit the following reports in accordance with the required <br /> schedule: <br />