Laserfiche WebLink
FORWARD LANDFILL <br />DAILY PRE-APPLICATIONINSPECTION FORM <br />Waste Discharge Requirements Order No. R5-2014-0006 . <br />Weather conditions: <br />Tcinperaturc: 6 �� <br />Wind direction: b— Wind speed: <br />Other relevant field conditions: <br />Evidenceof erosion ..... ............................................................................... ZrI io .............................. ❑ Yes <br />Bermcondition............................................................................................mod......................... ❑ Needs attention <br />Soil saturation .................... ..........�................ <br />........................................................ .. ...:.......... ❑Yes <br />Ponding ............................ <br />............................................................................E-10 .............................. ❑ Yes <br />Potential runoff to off-site areas............................................................. p No .............................. o Yes <br />Potential discharge to surface water ..................................................... C@'Ko .............................. ❑ Yes <br />Actual discharge to surface water........................................................... -NO ............................. ❑ Yes <br />Accumulation of organic solids.............................................................. of No .............................. ❑ Yes <br />clogging................................................................................................. elNo .............................. ❑ Yes <br />Odors that have the potential to be objectionable at or <br />beyond the property boundary................................................................ 6 No .............................. ❑ Yes <br />Vectors (insects, rodents)........................................................................ ............................. ❑ Yes <br />Documented observations requiring corrective action and corrective action taken (if applicable): <br />A)/A . <br />Note: No valves are required as part of the land appheation operation. <br />f"Ite/tiOperations me: 7/21/�rs @ 7 :246 S tures d '�'`:<r 114".igna - Tie: Manager <br />Ruben Ramirez <br />