Laserfiche WebLink
DAILY PRE -APPLICATION ION INS Ems, .8. ION FORM <br />0 Waste Discharge Requirements Order No. R5-2034-0006 <br />Weather conditions: o <br />Tcinperaturc: 7-2 <br />Wind direction: is SW Wind speed: <br />Other relevant field conditions: <br />Evidenceof erosion..................................:..........................................:.....�No .............................. ❑ Yes <br />Berm condition.................................................:.....................................:..amu` 'Good ........................... ❑ Needs. attention <br />Soilsaturation..............................................................................:................ el f�ro ............:................. o Yes <br />Ponding....................................................................................................... eff 1l° .............................. ❑ Yes <br />Potential runoff to off-site areas.............................................................P-N-0 •............................. ❑ Yes <br />Potential discharge to surface water.................................................�o .............................. ❑ Yes <br />Actual discharge to surface water........................................................................... . ❑ Yes <br />.............. <br />Accumulation of organic solids...........................................................'Erl 10 .............................. ❑ Yes <br />clogging............................................................................................. ............................. ❑Yes <br />®dors that have the potential to be objectionable at or /� <br />beyond the property boundary................................................................e No .............................. ❑ Yes <br />Vectors(insects, rodents)................................................................................................ ❑ Yes <br />Documented observations requiring corrective action and corrective action taken (if applicable): <br />Nole. No vahm- are required as part o� f'the land application operation. <br />f3' <br />L <br />l ate/time: 13/ ! 3— @Ao/S Signature: '{ ,-`ritle: Operations Manager <br />-T-,30 Ruben Ramirez <br />