My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015_4
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2015_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:22:20 AM
Creation date
7/3/2020 10:59:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2015_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 6.2.9 STRUCTURE REMOVAUDECOMMISSIONING OF ENVIRONMENTAL <br />CONTROL SYSTEMS <br />No costs are associated with this category since no structure removal or <br />decommissioning of environmental systems is required for closure of Stage IA. <br />6.2.10 ENGINEERING DESIGN <br />This category includes costs for the preparation of construction level engineering <br />design plans and specifications for bid purposes. This cost is assumed to be two <br />percent of the construction cost. <br />6.2.11 CONSTRUCTION MANAGEMENT <br />The construction management cost for the Stage IA closure is based on the <br />closure construction period. This cost is assumed to be 4 percent of the <br />construction cost. <br />0 6.2.12 CONTINGENCY <br />A 20 percent contingency factor has been added to the construction cost <br />estimate. <br />In accordance with 27 CCR, Section 21800, the operator is required to provide a <br />detailed schedule for disbursement of funds for closure for advance payment of <br />closure construction activities to be performed in accordance with the Plan or <br />reimbursement of costs to be performed in accordance with the Plan. Table 7 <br />shows the anticipated disbursement of funds necessary to complete construction <br />for Stage IA partial closure area of the Forward Landfill. Forward Landfill Inc. will <br />request a release of funds from the CIWMB Financial Assurance Branch prior to <br />the start of closure construction activities. <br />Forward Landfill PFCPCMP 6-3 <br />):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 6.doc: 6/9/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.