0 6.2.9 STRUCTURE REMOVAUDECOMMISSIONING OF ENVIRONMENTAL <br />CONTROL SYSTEMS <br />No costs are associated with this category since no structure removal or <br />decommissioning of environmental systems is required for closure of Stage IA. <br />6.2.10 ENGINEERING DESIGN <br />This category includes costs for the preparation of construction level engineering <br />design plans and specifications for bid purposes. This cost is assumed to be two <br />percent of the construction cost. <br />6.2.11 CONSTRUCTION MANAGEMENT <br />The construction management cost for the Stage IA closure is based on the <br />closure construction period. This cost is assumed to be 4 percent of the <br />construction cost. <br />0 6.2.12 CONTINGENCY <br />A 20 percent contingency factor has been added to the construction cost <br />estimate. <br />In accordance with 27 CCR, Section 21800, the operator is required to provide a <br />detailed schedule for disbursement of funds for closure for advance payment of <br />closure construction activities to be performed in accordance with the Plan or <br />reimbursement of costs to be performed in accordance with the Plan. Table 7 <br />shows the anticipated disbursement of funds necessary to complete construction <br />for Stage IA partial closure area of the Forward Landfill. Forward Landfill Inc. will <br />request a release of funds from the CIWMB Financial Assurance Branch prior to <br />the start of closure construction activities. <br />Forward Landfill PFCPCMP 6-3 <br />):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 6.doc: 6/9/2005 <br />