Laserfiche WebLink
0 7.0 PROFESSIONAL CERTIFICATION OF ACCURACY <br />Current regulations require that a registered civil engineer or a certified engineering <br />geologist prepare and certify the accuracy of closure plans for.all Class II landfills. The <br />Forward Landfill Stage IA Partial Final Closure/Post-Closure Maintenance Plan has been <br />prepared in accordance with 27 CCR, Chapters 3 and 4, and 40 CFR, Part 258, as certified <br />by Mr. Bryan Stirrat, a California Registered Civil Engineer, Registration Number C 22631. <br />Respectful itted: <br />QROFESS/p��`� <br />BRYAN A. <br />LU STIR T ,„ <br />22631 <br />Exp. 12-31-05 <br />s CI L <br />A. <br />BryaK A. Stirrat, P.E. <br />R.C.E. No. C 22631 <br />Forward Landfill PFCPCMP 7-1 <br />J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 7.doc: 6/9/2005 <br />