My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015_4
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2015_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:22:20 AM
Creation date
7/3/2020 10:59:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2015_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />TABLE 6 <br />FORWARD LANDFILL <br />CLOSURE COST ESTIMATE SUMMARY <br />STAGE IA PARTIAL CLOSURE AREA <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNIT PRICE <br />ESTIMATED COST <br />($) <br />11 <br />ENGINEERING DESIGN (4) <br />1 Is <br />$85,000 <br />$85,000 <br />Subtotal <br />Subtotal $73,692 <br />Total Construction Cost $2,107,483 <br />Contingency 20% $421,497 <br />Total Closure Cost Estimate $2,528,980 <br />Notes: <br />(1) Costs for preparation and compaction of the existing one foot of foundation is included in this item. <br />(2) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one <br />foot of soil would already be in place. <br />(3) No cost is included in this category because the system is currently in-place and/or no modification is required <br />as part of the Stage IA partial closure. <br />(4) Cost is for engineering design and preparation of construction documentation (plans and specifications) for <br />bid purposes. <br />(5) Cost is for monitoring contractors work, coordinating CQA activities, meetings, liaison between design <br />engineers and contractors, etc. <br />Forward Landfill PCPCMPR <br />J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\ClosCst.XLS; Revision 1: 6/14/2005 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.