My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2017_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2017_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 10:03:16 AM
Creation date
7/3/2020 10:59:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2017_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2017_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
603
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Progress Report - Third quarter 2016 <br />Austin Road Unit, Forward Landfill <br />Remediation System Operations and Performance Evaluation of Individual Extraction Points <br />CAO Task 6.a indicates that Quarterly Progress Reports shall include information on remedial <br />system operation and performance during the relevant quarter. The CAO does not provide a <br />definition of the term "remedial system". Forward, Inc. interprets the term to include the <br />groundwater extraction and treatment system, along with the landfill gas collection and destruction <br />system. Landfill gas collection and destruction provides source control. The Groundwater Treatment <br />Facility (GTF) provides remediation to impacted groundwater. Information relevant to each of the <br />remediation systems is provided below. As described in the CAO, the evaluation of individual <br />extraction points applies to both groundwater and landfill gas extraction points. <br />Groundwater Extraction and Treatment System <br />The GTF includes four groundwater extraction wells (EW -1, EW -2, EW -3R and EW -4), an above- <br />ground air stripper system, and an infiltration basin located north of the landfill. Each of these <br />components was previously approved by the RWQCB. <br />Del -Tech Geotechnical Support Services, Inc. (Del -Tech) performed operations and maintenance on <br />the GTF during the period of October 1 through December 31, 2016. The system monitoring logs <br />from Del -Tech for the fourth quarter 2016 are included in Attachment A. <br />Del -Tech records indicate that the groundwater extraction and treatment system experienced the <br />following maintenance issues and periods of downtime during the fourth quarter 2016: <br />November 18, 2016: De , <br />be found. Del -Tech reset the breaker. <br />Based on analytical laboratory testing results from October 31, 2016, the influent to the <br />groundwater treatment system contained 6.35 µg/L of VOCs. Based on totalizing flow meter <br />readings from Del -Tech, an estimated 19.4 million gallons of extracted groundwater was treated <br />during the fourth quarter 2016, yielding approximately 0.85 pounds of VOCs removed during this <br />period. <br />Trace concentrations of 1,4 -dichlorobenzene, tetra chloroethene, and trichloroethene were <br />measured in the monthly effluent samples. In addition, cis-1,2-dichloroethene was measured <br />above the PQL during each sampling event. Total VOC concentrations in the effluent were 1.10 <br />µg/L in October, 1.15 µg/L in November, and 1.00 µg/L in December. <br />Landfill Gas Collection and Destruction System <br />The landfill gas collection and destruction system servicing the Austin Road Unit at the Forward <br />Landfill consists of 107 landfill gas extraction wells, according to the 2015 GCCS Improvements Plans <br />prepared by Cornerstone Environmental. Collected landfill gas is routed to Flare A-2 for thermal <br />destruction, with Flare A-1 serving as a back-up flare. On a weekly basis SCS Field Services, Inc. (SCS) <br />records information such as methane gas concentration (percent by volume), oxygen concentration <br />(percent by volume), carbon dioxide concentration (percent by volume), balance gas (percent by <br />Project No. 2016.0007 1 Quarterly Progress Report - Fourth Quarter 2016 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.