Laserfiche WebLink
Project Name �w. Lr flr L- L- 4VALUE <br />Inspector's Name LIN)L- ) (SNN ) <br />Unit Tested W U — ,f ENGINEERING is <br />Date—2'7—(6 a -LR-31 <br />ANNUAL LCRS CONTINUITY TEST INSPECTION <br />(C) TRACER DYE DETECTION MONITORING LOG <br />Pump start time: 0 9D j Approximate pum flow rate: <br />Does the pump reading indicate continuous flow? Yes? No �— <br />Time Flow Rate pm) <br />o nj — to vv% <br />o902 I 04 w-, <br />0 q vs- l <br />0 T <br />DV <br />tiro <br />T <br />onto tiro <br />01 <br />Tracer Dye Detected (Y/N) <br />a <br />- . rPASS) <br />Was tracer dye detected from the LCRS sump? Yes X—No <br />If Yes, state approximate migration time to detection 22 6.6 <br />If No, state possible reason <br />Remedial Action Work Order Date Completed Si nature <br />Signature of Inspector <br />Page 2 of 2 <br />