Laserfiche WebLink
Project Name Y-Ro p--tuAFLD <br />Inspector's Name <WNIL <br />.4VA16UE <br />Unit Tested I AN V —W .... ENGINEERING <br />Date 1, q- 6--4-46 <br />ANNUAL LCRS CONTINUITY TEST INSPECTION <br />(C) TRACER DYE DETECTION MONITORING LOG <br />Pump start time: 0 835- M d U It Approximate pump flow rate: ^ i -h <br />Does the pump reading indicate continuous flow? Yes—X No <br />Time Flow Rate (gpm) <br />V�� v <br />OA(, <br />Tracer Dye Detected (Y/N) <br />N <br />IV <br />X a -d CPl�ss) <br />Was tracer dye detected from the LCRS sump? Yes -K—No <br />If Yes, state approximate migration time to detection 2.2 <br />If No, state possible reason NX <br />Remedial Action Work Order Date Completed Signature <br />Signature of Inspector <br />F <br />Page 2 of 2 <br />