Project Tasks <br /> The following tasks are identified for this project: <br /> 1 Mobilization-Site set up and take down <br /> 2 Utilities-Clearance <br /> 3 Drilling-Contractor oversi ht <br /> 4 Monitoring-Air monitoring using hand held or stationary equipment-non-radiation <br /> 5 Sam lin -Soil sameling using split spoons or continuous samplin2 tool <br /> 6 Monitor well-Well installation,development,or purging contractor oversi ht <br /> 7 Sam lin -Well sampling using mechanical methods <br /> 8 Waste-Containment of IDW in small containment devices greater than 10 gallons but less than ore ua <br /> 9 Decontamination-Arcadis oversight of contractors Rerforming decontamination <br /> 10 Operation and maintenance-Temporary,small or mobiles stem <br /> 11 Select <br /> 12 Select <br /> 13 Select <br /> 14 Select <br /> 15 Select <br /> 16 Select <br /> 17 Select <br /> 18 Select <br /> 19 Select <br /> 20 Select <br /> Supplemental documents associated with the above task(s): <br /> The Arcadis Utility Clearance Checklist must be used for utility clearance activities. <br /> This project will require preparation of a California Heat Illness Prevention Plan(HIPP)and Injury and <br /> Illness Prevention Plan(IIPP). <br /> ®Required Checklists/Work Forms ®Required Permits <br /> Tailgate Safety Briefing Form <br /> Vehicle Inspection Checklist <br /> Utility and Structures Checklist <br /> ®Required H&S Standards <br /> Bloodborne Pathogens ARC HSGE005 <br /> First Aid/CPR ARC HSGE004 <br /> Heat Stress Prevention ARC HSIH013 <br /> Short Service Employees(SSEs) <br /> SSEs(employees who are employed with Arcadis for less than 1 year)are not anticipated to be working <br /> on this project. If staffing changes occur during this project and SSEs are utilized,the project team <br /> working in conjunction with the SSE's administrative supervisor will ensure requirements of ARC <br /> HSGE019"Short Service Employees"are completed. SSE's will be identified in the project Tailgate <br /> • <br />