My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:59:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2019.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />0 <br />Purpose and Scope Date Completed 1/15/2019 Revised 5/23/2018 <br />The purpose of this document is to serve as a planning tool and implementation guide to help the Project Team Site, Site Safety Officer (SSO) or other designated responsible <br />party to comply with the requirements set forth by Cal/OSHA Title 8 CCR 3395 Heat Illness Prevention Standard and the Washington State Outdoor Heat Exposure <br />Regulations 296-62-09510 thru 09560. <br />Note: This HASP Supplement is required to be used in California and Washington states. The Arcadis Health and Safety Standards ARC <br />HSIHO13 Heat Stress Prevention, and ARC HSGE008 Injury and Illness Prevention Program (IIPP) must accompany this HASP <br />Supplement. To completely address the regulatory requirements for work in CA and WA states these standards are required to be used <br />in association with the project -specific HASP and this supplement. <br />Project sites in other states and provinces can use this HASP Supplement as a Best Management Practice to prevent heat illness related injury. <br />The scope of this HIPP applies to Arcadis projects which include, but are not limited to: outdoor operations conducted in hot weather such as construction, refining, oil and gas <br />extraction, asbestos removal, and hazardous waste site activities, especially those that require employees to wear semi -permeable or impermeable protective clothing that are <br />more likely to cause heat stress for the user. This HIPP provides guidance to prevent or reduce the risk of work-related heat illness. This HASP Supplement provides site <br />specific instructions for actions to be completed at the project site. <br />Project Site Name I Manteca, CA Project Manager JAron Hook <br />Authority and Implementation <br />The following designated individuals have authority and responsibility for implementing the provisions of this program at the project work site <br />indicated above. <br />Site Safety Officer (SSO) I Shawn Roberts I Designated Alternate j Beth Draeger <br />Procedures for Provision of Water <br />The SSO or designee will be responsible for implementing the following when conditions at the site are anticipated to exceed 80 degrees Fahrenheit (F) (26.6 Celsius [CI): <br />1. Proper hydration is critical to preventing heat related illness and injury. <br />Project sites need to maintain an adequate supply of suitably cool, fresh and pure potable water on site at all times to allow each employee to consume 1 quart (1 L) of water per <br />hour, ideally at a rate of four 8 -oz (250 mL) cups per hour. Fresh and pure is defined as "odor free" and "suitably cool" is defined as water being cooler than the ambient temperature but <br />not so cold as to cause discomfort or prevent drinking. <br />Note: Electrolyte replacement drinks or "Sports Drinks" should be used to replace essential minerals lost during sweating. Sports drinks should <br />supplement water intake e.g. one "sport drink" to every three bottles of water (3 waters : 1 sport drink). <br />Also, a teaspoon of salt added to every gallon of water could also be used. Entering the requested information into the formula provided below calculates the number of quarts of water <br />required per employee, per hours worked per day. <br />2. During the Tailgate Safety Meeting and site briefings identify and communicate the type and location of the water source. The water source must provide suitably cool, fresh and pure <br />water in sufficient quantity for all employees at the site. Water shall be provided free of charge or expenses will be reimbursed for employees. Note in the line below what type of water <br />source will be provided (e.g. onsite potable plumbed system, chilled coolers containing bottled water, or drinking water coolers and disposable cups in sufficient quantity to support all field <br />staff present). If the source is potable plumbed water do not complete Item 6 of this Section. <br />Potable plumbed source Bottled water in chilled cooler. Drinking water dispensers & cups <br />3. Communicate to staff whether all water for the day will be provided at the start of the shift (e.g., 2 gallons (8 L) per employee for an 8 -hour shift), or how and when water will be <br />replenished. <br />Note: A sufficient quantity of water must always be present and readily accessible to allow every employee to consume at least 1 quart (1 L) of <br />water per hour. It is suggested to have a minimum of three hours supply of water per employee on hand. <br />4. Water supplies must be positioned as close as reasonable possible to site workers. Placing water only in shaded areas or by toilet facilities is not sufficient, particularly at large work <br />sites or at multi -story construction sites. Drinking water sources need to be close enough to workers to allow for routine consumption. <br />5. Inspect the coolers / water dispensers for cleanliness and replenishment of water and cooling ice routinely based on temperatures and staff size. Cooling ice will be stored in clean <br />coolers if added directly to water dispensers. <br />Note: If the site temperature exceeds 90 deg. F (32 C) the frequency of the cooler inspection will increase to verify water remains cool and the <br />water supply is maintained. <br />6. Oversee the daily inspection and maintenance of coolers to ensure they are kept clean and in good condition. <br />Number of Work Hours Per Da Quarts of Water Needed <br />Below are calculations for using either water dispensers, or coolers stocked with bottles of water. <br />Gallons of Water P r Number of Coolers Needed Amount of 16 -oz Bottles Required <br />I NOTE - Cooler/bottle calculation accounts for one cooler stocked with 16 -ounce (500 mL) bottles to be provided for every four workers. Water dispensers come I <br />in varietv of sizes (e.q. 3. 5. 7 & 10 gallon. The gallons calculation is provided to clarify what size is sufficient for the onsite staff. <br />Form Color Key®Enterrequested Information <br />Calculation Completed <br />Check which situation applies. Must check at least one box, or provide additional detail. <br />Ice will be purchased at the start of each day by the site SSO or designee. <br />Ice will be distributed from on-site machine or service meeting applicable potable water standards. <br />Additional details: <br />of materials to order and keep on hand. <br />Anti -microbial hand cleaner. Food Safe cleaning product for water cooler. <br />Paper towels. Sufficient amount of drinking cups for each employee and water dispenser. <br />Potable water to clean coolers. Other Items - <br />
The URL can be used to link to this page
Your browser does not support the video tag.