My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:52:44 PM
Creation date
7/3/2020 11:00:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1989
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_1989.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />(Continued) <br />Rgqe <br />5.1.2 Excavation and Fill Sequence Plan <br />37 <br />5.2 <br />SITE CAPACITY AND SERVICE LIFE <br />38 <br />5.3 <br />EARTHWORK <br />38 <br />5.3.1 Excavation <br />38 <br />5.3.2 Earthfill <br />40 <br />5.3.3 Stockpile and Screening Berms <br />40 <br />5.4 <br />SLOPE STABILITY ANALYSES <br />41 <br />5.5 <br />SURFACE DRAINAGE AND CONTROL FACILITIES <br />42 <br />5.6 <br />LEACHATE MANAGEMENT <br />44 <br />5.6.1 Leachate Generation Potential <br />44 <br />5.6.2 Base Liner and Leachate Control Facilities <br />47 <br />5.6.3 Clay Liner <br />47 <br />5.6.4 Dendritive Network of Perforated Pipes <br />48 <br />5.7 <br />LANDFILL ACCESS <br />49 <br />5.7.1 Traffic Volume <br />49 <br />5.7.2 Planned Access Improvements <br />50 <br />6.0 OPERATIONS PLAN <br />52 <br />6.1 <br />LANDFILLING PROCEDURES <br />52 <br />6.2 <br />CONTINGENCY PLAN AND NOTIFICATION <br />53 <br />6.3 <br />HOURS OF SITE OPERATIONS <br />54 <br />6.4 <br />LANDFILL EQUIPMENT COMPLEMENT <br />54 <br />6.5 <br />PERSONNEL <br />55 <br />6.6 <br />CONTROL OF WORK <br />55 <br />6.7 <br />TECHNICAL DIRECTION <br />56 <br />6.8 <br />CONTROL OF NUISANCE FACTORS <br />56 <br />6.8.1 Noise <br />56 <br />6.8.2 Odor <br />56 <br />6.8.3 Litter <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.