n <br />u <br />C <br />SECTION 5 <br />(04/03) <br />SECTION 5. GENERAL <br />SECTION 5-1. MISCELLANEOUS <br />5-1.01 PREVAILING WAGE. --Attention is directed to Section 7-1.01A(2), <br />"Prevailing Wage," of the Standard Specifications. <br />5-1.015 OFF-SITE FABRICATION AT PERMANENT YARDS AND <br />SHOPS. --Bidders are advised that a recent Department of Industrial relation's <br />determination indicates Fabricators are subject to prevailing wage requirements under <br />the following conditions: <br />Workers employed by contractors or subcontractors are "employed in the <br />execution of a contract for public works" when they are engaged in the off-site <br />fabrication of items produced specially for the public works project and not for sale on <br />the general market. <br />Where a contractor is producing products both for its own projects and for sale <br />on the general market, the test for whether a pre -fabricated item is specially made for <br />the public works project turns on factors such as whether the item was produced in <br />accordance with the plansr and specifications of the architects and/or engineers for that <br />project and/or shop drawings based thereon such that the item differs from a standard, <br />generic item. <br />Standard items shall be considered to be produced specially for the public works <br />project if they were modified to meet the specific requirements of that project. <br />For .the foregoing reasons, prevailing wages must be paid to the employees of <br />contractors and subcontractors engaged in the off-site fabrication or pre -fabrication of <br />items specially produced for public works projects. <br />5-1.02 GENERAL PREVAILING WAGE RATES, EQUIPMENT RENTAL <br />RATES, AND LABOR SURCHARGE.. --The general prevailing wage rates applicable to <br />the work to be done are on file in the Department of Public Works and with the Clerk of <br />the Board of Supervisors. <br />5-1.03 INCREASED OR DECREASED QUANTITIES. --If the total pay <br />quantity of any item of work, subject to the provisions of Section 4-1.03B, "Increased or <br />Decreased Quantities," varies more than 25 percent, compensation to the Contractor <br />will be at contract unit prices except that an adjustment will be made in accordance with <br />the provisions of Section 4-1.03, "Changes," of the Standard Specifications if requested <br />in writing by the Contractor or is deemed in the best interest of County by the Engineer. <br />Written requests.by the Contractor shall be accompanied by adequate data to support <br />costs of the item. <br />5-1 a <br />(SPEMCO-5-1 R) <br />1 <br />