Laserfiche WebLink
SECTION 8. MATERIALS <br />8-1.01 GENERAL. Attention is directed to Section 6, "Control of <br />Materials," of the Standard Specifications and these special provisions. <br />8-1.02 WEIGHING MATERIALS. --Attention is directed to Section 9, <br />"Measurement and Payment," of the Standard Specifications and these special <br />provisions. <br />The cost shall be considered as included in other contract items of work, and no <br />further allowance shall be made therefor. <br />In no event will County pay for any portion of a load of material which is in excess <br />of the legal load limit for the vehicle transporting it. The payment for the weight of all <br />material in excess of legal load limits will be deducted from the contract pay quantity for <br />that speck material. <br />(SPECSWASTEMO-8-1) <br />NCLF-8-1-EJ <br />