My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 10 <br />' (11/92) <br />excavated during drilling or other activity to the active working face of the landfill, and <br />' shall deposit it as directed by landfill operations personnel. <br />The Contractor shall remove excavated refuse and residual refuse from the <br />' landfill surface, and deliver this refuse to the active landfill face by 3:00 p.m. of the day <br />in which the refuse was excavated. The Contractor shall cover refuse not delivered to i <br />the active face by the time identified with 10 mil plastic or equivalent, and shall secure <br />the edges of the cover to the satisfaction of the Engineer. Refuse covered by plastic <br />shall be removed to the active landfill face by 10:00 the next day. Workers will be <br />allowed on site to deliver plastic -covered refuse to the active face on Saturday <br />' mornings, if so requested by the Contractor. <br />OPEN TRENCHES. --Contractor shall cover trenches in which refuse is exposed <br />' by a tarp at the end of the work day. Contractor shall backfill trenches containing <br />refuse within 24 hours of initial excavation. Access to the site during Saturdays or <br />Sundays will not be allowed for the purpose of backfilling trenches. <br />10-1.02 STAKING.--Stakin shall conform to the provisions of Section <br />9 <br />5-1.07, "Lines and Grades," of the Standard Specifications and these special <br />provisions, and to Section 01055 of the Technical Specifications. <br />' 10-1.03 PROGRESS SCHEDULE. --Attention is directed to <br />Section 8-1.04, "Progress Schedule," of the Standard Specifications and these special <br />provisions. The Progress Schedule shall include, at a minimum, the following items: <br />' a. Award of Contract <br />b. Submittal of the LFG flare station information (may occur prior to Notice to Proceed) <br />' c. Notice to proceed issued by the County <br />d. Mobilizing equipment and materials to the site <br />e. Survey of LFG well and other drill points <br />' f. Drilling LFG wells <br />g. Connecting LFG piping <br />h. Installing concrete <br />' i. Electrical work <br />j. Placement of flare skid <br />k. Demobilization <br />The Contractor shall update the Progress schedule when requested by the Engineer. <br />' The Progress Schedule shall show Contractor's work on site from Notice to proceed to <br />the end of the contract period. <br />1 10-4 <br />(SPECSWASTEMCO-10-1 } <br />' NCLF-10-1-EJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.