Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />PART 1 GENERAL <br />1.01 SUN 4ARY <br />A. The Contractor shall indicate the location of the vertical wells, the gas header <br />alignment, flare station, and equipment locations by field staking using a licensed <br />surveyor. <br />B. Coordinates for each vertical well and probe are shown on the Drawings. An <br />AutoCAD file will be provided to the Contractor for his use in determining the <br />coordinates for the header alignment. The AutoCAD files shall not be used for <br />any other purpose except to determine survey coordinates. <br />C. The Contractor shall furnish offset and grade stakes for the gas header alignment. <br />D. The accuracy of all the Contractor's stakes, alignments and grades is the <br />responsibility of the Contractor. The Department may check Contractor's stakes, <br />alignments and grades at any time. Work dependent on the Contractor's stakes <br />shall be postponed until checking is completed. The Contractor shall allow the <br />Department three (3) work days to check field staking prior to proceeding with the <br />Work. <br />PART 2 MATERIALS <br />PART 3 EXECUTION <br />North County LFG Collection System 1 <br />San Joaquin County Public Works <br />CONSTRUCT10N STAKING <br />Section 01055 <br />