My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />PART 1 GENERAL <br />1.01 SUN 4ARY <br />A. The Contractor shall indicate the location of the vertical wells, the gas header <br />alignment, flare station, and equipment locations by field staking using a licensed <br />surveyor. <br />B. Coordinates for each vertical well and probe are shown on the Drawings. An <br />AutoCAD file will be provided to the Contractor for his use in determining the <br />coordinates for the header alignment. The AutoCAD files shall not be used for <br />any other purpose except to determine survey coordinates. <br />C. The Contractor shall furnish offset and grade stakes for the gas header alignment. <br />D. The accuracy of all the Contractor's stakes, alignments and grades is the <br />responsibility of the Contractor. The Department may check Contractor's stakes, <br />alignments and grades at any time. Work dependent on the Contractor's stakes <br />shall be postponed until checking is completed. The Contractor shall allow the <br />Department three (3) work days to check field staking prior to proceeding with the <br />Work. <br />PART 2 MATERIALS <br />PART 3 EXECUTION <br />North County LFG Collection System 1 <br />San Joaquin County Public Works <br />CONSTRUCT10N STAKING <br />Section 01055 <br />
The URL can be used to link to this page
Your browser does not support the video tag.