My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 5:58:06 PM
Creation date
7/3/2020 11:02:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2009.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landfill Gas Migration Monitoring Well Installation Report October 2009 <br /> North County Landfill Project No. 03160203 <br /> • Before placing the probes in the borehole, the total pipe lengths and the <br /> perforation lengths were measured in the presence of Vector and EHD staff, <br /> to confirm that the lengths were in accordance with the project's Plans and <br /> Specifications. Any necessary adjustements were performed by LFG Control <br /> personnel. <br /> • The deep probe was then placed in the borehole (Photograph 17, Appendix B). <br /> Clean gravel pack was backfilled around the probe, extending six inches <br /> above the top of the probe pipe perforations (Photograph 18, Appendix B). <br /> The depth to the top of the gravel pack was measured frequently during <br /> backfilling, until the desired depth (per the Plans and Specifications) was <br /> reached. <br /> • Five feet of bentonite was placed above the gravel pack. The depth to the top <br /> of the bentonite plug was measured before placing the intermediate probe <br /> pipe. <br /> • The remaining probes, gravel packs and bentonite seals were constructed in a <br /> similar fashion, according to the design shown in Figure 3. <br /> The installation of all the probes and backfill of the borehole with gravel pack and <br /> bentonite was observed by EHD inspectors. All probes were installed to design <br /> depth and specifications, except for those which were modified in the field in <br /> accordance with Title 27 Section 20925, where sand lenses in the native soil <br /> overlapped the backfilled bentonite seals that separate the gravel pack intervals. In <br /> each instance where sand layers were encountered in proposed bentonite seal <br /> intervals, the Vector inspector first notified Public Works field division and EHD <br /> inspectors. All adjusted probe dimensions were approved in the field by EHD <br /> inspectors. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.