Laserfiche WebLink
E <br />El <br />E <br />0 <br />(")�CAVATIO,, <br />SLOPE 2 <br />jf <br />SYSTEM <br />LINER <br />SETBACK <br />NOTES: <br />1. REFER TO DRAWING C1 FOR PERIMETER DRAINAGE CONTROLS. <br />2. TOPOGRAPHY PROVIDED BY TRI STATE SURVEYING LTD., <br />SPARKS, NEVADA 3/12/2009. TOPOGRAPHY IS NAVD 88. <br />3. THE LCRS SUMP WILL INCLUDE A LINED SECONDARY <br />MONITORING SYSTEM AND A LINED 4 FOOT DEEP PRIMARY <br />LEACHATE REMOVAL SUMP. <br />-C—f,3S'471 C <br />LCRS PIPE INTERCEPTION (TYP.) <br />EXISTING <br />INTERIM <br />4"LAIER <br />6 <br />III EDIMENTATIO <br />�jll <br />LCRS PIP S <br />2 4 <br />PONDIII <br />2 1 1 <br />(TYP.) <br />30' WIDE <br />EARTHFILL <br />Typ. <br />SOIL BERM <br />—,LIMIT <br />01 <br />LIINER <br />27— <br />100' SETBACK <br />V) <br />BASE <br />CRS <br />uj <br />7 <br />LINER <br />C) III . <br />g <br />JII� <br />gII <br />SYSTEM <br />(TYP.), <br />PIPE <br />2;7 <br />=41 <br />ft <br />0 <br />(")�CAVATIO,, <br />SLOPE 2 <br />jf <br />SYSTEM <br />LINER <br />SETBACK <br />NOTES: <br />1. REFER TO DRAWING C1 FOR PERIMETER DRAINAGE CONTROLS. <br />2. TOPOGRAPHY PROVIDED BY TRI STATE SURVEYING LTD., <br />SPARKS, NEVADA 3/12/2009. TOPOGRAPHY IS NAVD 88. <br />3. THE LCRS SUMP WILL INCLUDE A LINED SECONDARY <br />MONITORING SYSTEM AND A LINED 4 FOOT DEEP PRIMARY <br />LEACHATE REMOVAL SUMP. <br />-C—f,3S'471 C <br />LCRS PIPE INTERCEPTION (TYP.) <br />LCRS RISER PIPE (TYP.)8 <br />2 8Ft <br />SCALE IN FEET <br />0 150 300 2-18"0 LCRS RISER PIPE (TYP.) <br />2 71 <br />EXCAVATION PLAN DWG. NO. <br />PRELIMINARY CLOSURE AND POSTCLOSURE 2 <br />841ii-shaw Environmental, Inc. MAINTENANCE PLAN Sheet 3 of 5 <br />REV DATE DESCr4p7M DYM BY DES Br CHN BY PPF BYNORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL PROJECT NO. <br />DATE a 541E ovmno 0. :Y N. STQR-ZAND SAN JOAQUIN COUNTY. CALIFORNIA 118040 <br />4"LAIER <br />6 <br />LCRS PIP S <br />2 4 <br />2 1 1 <br />(TYP.) <br />30' WIDE <br />EARTHFILL <br />Typ. <br />SOIL BERM <br />—,LIMIT <br />01 <br />LIINER <br />100' SETBACK <br />BASE <br />CRS <br />LINER <br />P <br />SUMP <br />6" LCRS <br />SYSTEM <br />(TYP.), <br />PIPE <br />=41 <br />ft <br />It '1L:WL <br />-ad <br />LCRS RISER PIPE (TYP.)8 <br />2 8Ft <br />SCALE IN FEET <br />0 150 300 2-18"0 LCRS RISER PIPE (TYP.) <br />2 71 <br />EXCAVATION PLAN DWG. NO. <br />PRELIMINARY CLOSURE AND POSTCLOSURE 2 <br />841ii-shaw Environmental, Inc. MAINTENANCE PLAN Sheet 3 of 5 <br />REV DATE DESCr4p7M DYM BY DES Br CHN BY PPF BYNORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL PROJECT NO. <br />DATE a 541E ovmno 0. :Y N. STQR-ZAND SAN JOAQUIN COUNTY. CALIFORNIA 118040 <br />